Charles-George Reclamation Trust Landfill
Charles-George Reclamation Trust Landfill | |
---|---|
Superfund site | |
Geography | |
Town | Tyngsborough |
County | Middlesex |
State | Massachusetts |
Coordinates | 42°39′57″N 71°26′45″W / 42.665902°N 71.445765°W |
Information | |
CERCLIS ID | MAD003809266[1] |
Contaminants | Benzene, tetrahydrofuran, arsenic, 1,4-dioxane, and 2-butanone[1] |
Responsible parties | Dorothy George and Charles George |
Progress | |
Proposed | October 23, 1981[1] |
Listed | September 8, 1983[1] |
Construction completed | September 25, 1998 |
List of Superfund sites |
The Charles-George Reclamation Trust Landfill[1] is a hazardous waste site located in the town of Tyngsborough, Massachusetts which is part of the Environmental Protection Agency's Superfund program. It is now the site of a 2.6 MW solar farm.[2]
Geography
[edit]The 19-acre (7.7 ha)[3] site is located one mile (1.6 km) from the center of Tyngsborough near the Dunstable border. Additionally, the landfill is bordered by a 16-acre (6.5 ha) marsh and 61-acre (25 ha) pond to the east, dubbed Flint Pond Marsh and Flint Pond respectively as well as the Dunstable Brook to the west.[4]
History
[edit]Originally a landfill serving local communities in the 1950s and 1960s, the landfill was expanded in 1967 to accept both household and industrial waste, and from 1973 to 1976 to accept hazardous waste. During the period of hazardous waste acceptance, the site accumulated a large quantity of volatile organic compounds and metal slugs. In 1981, the site was assessed to have the fourth largest amount of hazardous waste in the New England area out of 302 New England landfills assessed.[5] Upon further assessment it was found that over 1,000 pounds (450 kg) of mercury was disposed of and 2,500 cubic yards (1,900 m3) of chemical wastes were deposited in the landfill. It was found that the contaminants had leaked into the groundwater and contaminated nearby wells at the Cannongate Condominium. In 1983 contaminants had been found in the wells of households neighboring the condominium.[6] Following the sites state-ordered closure in 1983 to 1998 the site was subjected to clean up by the Environmental Protection Agency which included the creation of a permanent water supply for residents, the migration of contaminants, and the capping of the landfill.[1] In 2017, construction was completed of a 2.6 MW solar farm consisting of 10,000 panels and constructed by the Citizens Energy Corporation.[3]
Environmental damage
[edit]In addition to groundwater contamination, Flint Pond has also suffered contamination due to its proximity to the site. Several species of fish and eels were found to have increased levels of mercury and arsenic in their bodies.[7]
Litigation
[edit]In 2003, the site's former owners, Dorothy George and Charles George, settled all claims against them for $3.8 million. The trustees later paid the Massachusetts Division of Fish and Wildlife $1.2 million in 2004 and $625,000 in 2007 to establish conservation land in the towns of Tyngsborough and neighboring Dunstable.[4]
References
[edit]- ^ a b c d e f "Waste Site Cleanup & Reuse in New England". Yosmite.epa.gov. Retrieved 20 November 2014.
- ^ "U.S. Energy Mapping System". eia.gov. United States Energy Information Administration. Retrieved 5 June 2018.
- ^ a b Greenstein, Linda (6 December 2017). "Tyngsborough landfill converted to solar farm". Boston Globe. Retrieved 5 June 2018.
- ^ a b "Charles George Reclamation Trust Landfill Superfund Site NRD Settlement". Mass.gov. Retrieved 20 November 2014.
- ^ Detterman, Karen (November 27, 1981). "Tyngsboro Landfill degree under negotiation". The Nashua Telegraph. Vol. 113, no. 227. Retrieved 20 November 2014.
- ^ United States. Environmental Protection Agency (December 1984). Hazardous waste sites: descriptions of sites on current National Priorities List October 1984. p. 173. Retrieved 27 November 2014.
- ^ "Case: Charles George Landfill, MA". noaa.gov. Archived from the original on 19 December 2014. Retrieved 24 November 2014.