Jump to content

Bharuch high-speed railway station

Coordinates: 21°41′50″N 72°57′06″E / 21.6973°N 72.9517°E / 21.6973; 72.9517
From Wikipedia, the free encyclopedia
Bharuch high-speed railway station
Mumbai-Ahmedabad High-Speed Railway station
General information
LocationKunkarwada, Bharuch, Gujarat, India
Coordinates21°41′50″N 72°57′06″E / 21.6973°N 72.9517°E / 21.6973; 72.9517
Elevation35 metres (115 ft)
Owned byNational High Speed Rail Corporation Limited
Operated byNational High Speed Rail Corporation Limited
Line(s)Mumbai–Ahmedabad high-speed rail corridor
Platforms2
Tracks2
Construction
Structure typeElevated
ParkingYes
Other information
StatusUnder construction[1]
History
OpenedAugust 2026; 1 year's time (2026-08)[2]
ElectrifiedYes
Route map
Sabarmati Depot and Workshop
Sabarmati
Sabarmati Junction railway station  Red Line  Ahmedabad Bus Rapid Transit System
Ahmedabad
Ahmedabad Junction railway station Kalupur Railway Station metro station Ahmedabad Bus Rapid Transit System
(Golden Quadrilateral)
Anand/Nadiad
Maintenance Depot
Indian Railways
Delhi–Mumbai Expressway
NH48-IN.svg NH 48 (Golden Quadrilateral)
Vadodara
Vadodara Junction railway station
Western
DFC
Bharuch
Western DFC
Indian Railways
Surat
Surat Depot
Indian Railways
(Golden Quadrilateral)
Bilimora
NH48-IN.svg NH 48 (Golden Quadrilateral)
Maintenance Depot
Vapi
Dadra and Nagar Haveli
Gujarat
border
Gujarat
Maharashtra
border
NH48-IN.svg NH 48 (Golden Quadrilateral)
Boisar
Maintenance Depot
Indian Railways and Western DFC
Virar
NH48-IN.svg NH 48 (Golden Quadrilateral)
Indian Railways and Western DFC
Ulhas River
Indian Railways
Thane Depot and Workshop
Mumbai Suburban Railway
Thane
Mumbai Suburban Railway
7 km (4.3 mi) tunnel under Thane Creek
Mumbai BKC
Key
Indian Railways (including Western DFC on the same line)
Western DFC
Western DFC (under construction)
Ahmedabad Metro
Location
Bharuch high-speed railway station is located in Gujarat
Bharuch high-speed railway station
Bharuch high-speed railway station
Location within Gujarat
Bharuch high-speed railway station is located in India
Bharuch high-speed railway station
Bharuch high-speed railway station
Bharuch high-speed railway station (India)
Map
Interactive map

Bharuch high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Kunkarwada, Bharuch, Gujarat, India. It is the eighth station of the Mumbai–Ahmedabad high-speed rail corridor, after Surat station and before Vadodara station.[3][1]

Construction

[edit]

The National High-Speed Rail Corporation Limited (NHSRCL) had invited tenders for Package "C4" of the Mumbai-Ahmedabad high-speed rail corridor (MAHSR) in September 2020, with a deadline of around 4 years.[4] In October 2020, Larsen and Toubro won the tender.[5] The NSHRCL signed an agreement with Larsen and Toubro for the design and construction of Vapi station and its depot, Bilimora station, Surat station and its depot, Bharuch and Vadodara stations in November 2020.[6] In August 2021, Larsen and Toubro began construction on the station, after acquiring 12.9 hectares of land near Kunkarwada. The station is slated to be completed by August 2026, the time also slated for opening of the Gujarat section of the high-speed rail corridor.[2][1]

Lines

[edit]

The station will be served by the Mumbai–Ahmedabad high-speed rail corridor, and will be the eighth station of the Mumbai–Ahmedabad high-speed rail corridor in Bharuch.[7][1]

Structure

[edit]

The station will have two platforms and two tracks for regular services. It will have three levels–the platform, concourse and service floor as the entrance level. The design of the station will be inspired by Bharuch's famous cotton weaving industry and the Bandhani technique, honouring 150 years of the industry and its artists. The station area will have 2 platforms of 425 m (1,394 ft) length for 16-coach E5 Series Shinkansen trains.[8]

Features

[edit]

The station will have all modern and advanced facilities and amenities for customers and passengers, distinct from Indian Railway stations and similar to airports. Its design has been made to accommodate sufficient space for passenger movement and amenities at the concourse and platform areas. There will be ticketing and waiting areas, a business-class lounge, a nursery, restrooms, smoking rooms, information booths, retail centres and a public information and announcement system. Moreover, skylight provisions will be present on the roof and exterior sides for natural lighting and reduced energy usage. The station will be developed as a transport hub through integration with all basic modes of transportation for better, faster and hassle-free connectivity to and from the station, such as autos, buses and taxis. Such features will be available in all 12 stations of the Mumbai-Ahmedabad high-speed rail corridor.[9][8]

Land acquisition issues

[edit]

When the National High Speed Rail Corporation Limited (NHSRCL) began land acquisition for the station and the high-speed railway viaduct, they were met with protests from farmers in the region because of not only losing their land but also the fear of not getting sufficient compensation from NHSRCL, thus fearing them of losing their livelihoods as a whole. They demanded various topics to be discussed so that they could sustain their lives while carrying out their occupations under the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 and to the Annual Statement of Rate (ASR) for compensation. The NHSRCL officials advised the land acquisition officer of Bharuch district to prepare a report on these topics and send it to the district revenue department for review to issue a final notice for the land acquisition to be undertaken. The main reasons for which the farmers objected were the implementation of all acquisition procedures based on the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, and to carry out social and environmental impact assessments under the Land Acquisition Act, 2013. Any debate regarding how the project would affect the farmers, their farmlands and how it would benefit the farmers during and after the project's execution was undone. The farmers concluded that their opposition would continue until their requests were resolved. Finally, NHSRCL, Indian Railways, the central and state governments reached a consensus on paying all farmers in the entire Gujarat section of the Mumbai-Ahmedabad high-speed rail corridor not only a fair but a double compensation for their livelihoods to be sustained, and hence, the problem got resolved on time and did not lead to delay in land acquisition and execution of the project.[10][11]

Connectivity

[edit]

Road

[edit]

The station is being built just next to the Bharuch-Dahej Road, or Gujarat SH-6, towards north. Because of this location, it will be accessible easily from Bharuch and Ankleshwar, as well as from the under-construction Delhi–Mumbai Expressway. Most of the stations being built in the Gujarat section of the Mumbai-Ahmedabad high-speed rail corridor are located near or next to state or national highways, in order to provide better and direct connectivity to the stations.[12]

Rail

[edit]

The nearest railway station after the station's completion will be Bharuch Junction railway station, located around 8 km (5.0 mi) east from the station.

See also

[edit]

Notes

[edit]
  1. ^ under construction; operational till Bharuch, as of December 2024.

References

[edit]
  1. ^ a b c d "Bullet train project: Updates from Bharuch district". DeshGujarat. 30 December 2018. Retrieved 12 October 2023.
  2. ^ a b "Bullet train by August 2026, hyperloop 7-8 years away: Railways Minister Ashiwini Vaishnaw". The Economic Times. 14 March 2023. Retrieved 12 October 2023.
  3. ^ "Mumbai – Ahmedabad High Speed Rail – Information, Route Map, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 12 October 2023.
  4. ^ "3 Bidders for Mumbai – Ahmedabad HSR's Package C4". The Metro Rail Guy. 23 September 2020. Retrieved 12 October 2023.
  5. ^ "Bullet train: L&T wins Rs 25,000-crore order for Gujarat stretch". Moneycontrol. 28 October 2020. Retrieved 8 October 2023.
  6. ^ "Bullet Train Project: Agreement Signed With L&T For India's Biggest Infrastructure Contract". NDTV Profit. 28 November 2020. Retrieved 8 October 2023.
  7. ^ "Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor Final Report Volume 6" (PDF). Japan International Cooperation Agency (JICA). Retrieved 12 October 2023.
  8. ^ a b Mishra, Kamal (18 July 2022). "Mumbai-Ahmedabad bullet train station facades to be built representing city's character; details inside". Free Press Journal. Retrieved 12 October 2023.
  9. ^ Aklekar B., Rajendra (10 February 2023). "Maharashtra: Designs of four bullet train stations unveiled". Mid-Day. Mumbai. Retrieved 12 October 2023.
  10. ^ "Bullet train project: In Bharuch, land officer lists 12-point farmers' objections". The Indian Express. 21 June 2018. Retrieved 12 October 2023.
  11. ^ "How Ahmedabad-Mumbai bullet train project has turned many into crorepatis". The Economic Times. 27 April 2023. Retrieved 12 October 2023.
  12. ^ Rupera, Prashant (16 May 2018). "Bullet train terminals planned close to highways". The Times of India. Retrieved 12 October 2023.