Jump to content

B1 (Guangzhou Metro car)

From Wikipedia, the free encyclopedia
B1
B1 train at Xiajiao Depot
Stock typeClass B EMU
In service26 December 2005-present
ManufacturerSiemens Mobility and CSR Zhuzhou Locomotive
Built atZhuzhou, China
Constructed2005-2007
Entered service26 December 2005
Number built120
Number in service120
FormationMcp-T-Mcp
Fleet numbers03A001~03A002-03A039~03A040
Capacity240 per car
OperatorsGuangzhou Metro Group
DepotsXiajiao Depot
Jiahe Depot
Lines served 3 
Specifications
Car body constructionAluminum alloy
Train length59.94 m (196 ft 8 in)
Car length19.98 m (65 ft 7 in)
Width2.8 m (9 ft 2 in)
Height3.8 m (12 ft 6 in)
DoorsElectric doors
Maximum speed120 km/h (75 mph)
Traction systemSiemens Mobility G1500 D1000/300 M5-1 IGBT-VVVF
Traction motorsSiemens Mobility 1TB2013-1GA02 3-phases AC induction motors
AccelerationMaximum 0.9 km/(h⋅s) (0.559 mph/s)
Deceleration1.0 km/(h⋅s) (0.621 mph/s) (service)
1.3 km/(h⋅s) (0.808 mph/s) (emergency)
Electric system(s)1,500 V DC
Current collector(s)Single-arm Pantograph
UIC classificationBo′Bo′+2′2′+Bo′Bo′
BogiesSiemens Mobility SF2500[1]
Track gauge4 ft 8+12 in (1,435 mm)

The B1 (also known as Guangzhou Metro Line 3 Trains) is a class of rolling stock built for Line 3 of Guangzhou Metro. They are built by Siemens Mobility and CSR Zhuzhou Locomotive. B1 is the first mass-produced B-class rolling stock for the Guangzhou Metro. They entered service on 26 December 2005.[2]

B1 sets are double-paired for service since 20 April 2010, to expand the service capacity of Line 3.[3]

Description

[edit]

The B1s feature Siemens traction motors, Knorr EP-2002 electronic braking systems, plug-style doors and electronic strip maps.[4]

History

[edit]

The B1 contract was awarded to Siemens Mobility on 19 May 2003, who won the A1 contract before. The first train completed on 18 November 2005.[5]

On 8 January 2010, the first train (set 03x001-002) received an overhaul at Xiajiao Depot.[6]

Roster

[edit]
 
Formation 03A0xx

(Tcp)

03B0xx

(T)

03C0xx

(Tcp)

Numbers 03A001

03A039

03B001

03B039

03C001

03C039

  • Mcp – Motor car with drive cab and pantograph
  • T – Trailer car[7]


References

[edit]
  1. ^ "First Class Bogies" (PDF). Siemens Mobility. Archived from the original (PDF) on 2019-07-22.
  2. ^ 广州地铁3号线开通 时速达120公里 Archived 2005-12-29 at the Wayback Machine.信息时报.2005-12-27
  3. ^ 广州地铁三号线列车提前加长 3节车厢改6节 Error in Webarchive template: Empty url..南方日报.2010-04-05
  4. ^ 陶功安,袁立祥,马景成 (2006). "广州地铁3号线地铁车辆". 机车电传动 (4): 53~59. Archived from the original on 2022-01-07. Retrieved 2022-01-07.
  5. ^ "我国设计时速最快的地铁列车在湖南株洲下线". Archived from the original on 2014-03-18. Retrieved 2014-05-14.
  6. ^ "三号线首列车运行5年大体检". Archived from the original on 2014-03-18. Retrieved 2012-06-21.
  7. ^ 广州地铁集团有限公司 (2013-12-24). "三号线列车介绍". Archived from the original on 2021-11-06. Retrieved 2022-01-06.