Jump to content

Çolakoğlu power station

From Wikipedia, the free encyclopedia
Çolakoğlu power station
Country
  • Turkey
StatusOperational
Commission date
  • 2000
Owner
  • Çolakoğlu Metalurji
Thermal power station
Primary fuel
Power generation
Nameplate capacity
  • 190 MW
Annual net output
  • 1,024 GWh (2022)
  • 1,189 GWh (2021)
  • 1,191 GWh (2019)
  • 1,272 GWh (2020)

Çolakoğlu power station (also known as Çolakoğlu-2 or Gebze Çolakoğlu) is a 190-megawatt coal-fired power station in Turkey in Gebze, Kocaeli Province, which burns imported and local coal.[1][2][3][4] The company called Marmara Elektrik is part of Çolakoğlu Group,[5] and has been put on the Urgewald Global Coal Exit List.[6]

References

[edit]
  1. ^ "Çolakoğlu Termik Santrali". Enerji Atlası (in Turkish). Retrieved 2022-02-05.
  2. ^ "Türkiye'deki Termik Santraller". Sesa Teknik - Enerji Çimento Metalürji. 2016-03-08. Retrieved 2022-02-05.
  3. ^ "2022'de 51 santrale kapasite desteği verilecek". Enerji Günlüğü (in Turkish). 2021-11-01. Retrieved 2022-02-05.
  4. ^ "TEKRAR-2020 Yılında Kapasite Mekanizmasından faydalanacak olan santrallerin listesi yayımlandı - Uzmanpara Milliyet". Uzmanpara.com. Retrieved 2022-02-05.
  5. ^ "İş Ortaklarımız".
  6. ^ "Explore the Data". coalexit.org. 2023.
[edit]