Jump to content

Dinorwic quarry

Coordinates: 53°07′34″N 4°05′53″W / 53.12611°N 4.09806°W / 53.12611; -4.09806
From Wikipedia, the free encyclopedia
(Redirected from Vivian Quarry)

Dinorwic
Vivian quarry, part of the Dinorwic quarry
Location
Map of Gwynedd showing the position of the quarry
Map of Gwynedd showing the position of the quarry
Dinorwic
Location in Gwynedd
LocationDinorwig, near Llanberis
CountyGwynedd (formerly Caernarfonshire)
CountryWales
Coordinates53°07′34″N 4°05′53″W / 53.12611°N 4.09806°W / 53.12611; -4.09806
SH 59631 60860
Production
ProductsSlate
TypeQuarry
History
Opened1787 (1787)
ClosedJuly 4th 1969 (July 4th 1969)

Dinorwic quarry (/dɪˈnɔːrwɪɡ/ din-OR-wig; Welsh: [dɪˈnɔrwɪɡ]; also known as Dinorwig quarry) is a large former slate quarry, now home to the Welsh National Slate Museum, located between the villages of Llanberis and Dinorwig (formerly Dinorwic) in Wales. At its height at the start of the 20th century, it was the second largest slate quarry in Wales (and thus, the world), after the neighbouring Penrhyn quarry near Bethesda.[1] Dinorwic covered 700 acres (283 ha) consisting of two main quarry sections with 20 galleries in each. Extensive internal tramway systems connected the quarries using inclines to transport slate between galleries.[2] Since its closure in 1969, the quarry has become the site of the National Slate Museum, a regular film location, and an extreme rock climbing destination.

History

[edit]
Walter Warwick Vivian, manager of Dinorwic, in 1896

The first commercial attempts at slate mining took place in 1787 when a private partnership obtained a lease from the landowner, Assheton Smith. Although this was met with moderate success, the outbreak of war with France, taxes, and transportation costs limited the development of the quarry. A new business partnership led by Assheton Smith was formed on the expiry of the lease in 1809 and the business boomed after the construction of a horse-drawn tramway to Port Dinorwic in 1824.

At its peak in the late 19th century, "when it was producing an annual outcome of 100,000 tonnes", Dinorwic employed more than 3,000 men and was the second-largest opencast slate producer in the country. Although by 1930 its working employment had dropped to 2,000, it continued in production until 1969.

Quarrying

[edit]
Dinorwic quarry, showing major inclines, mills, levels, and tramways, and the Padarn Railway and Dinorwic Railway

The slate vein at Dinorwic is nearly vertical and lies at or near the surface of the mountain, allowing it to be worked in a series of stepped galleries . This is however not quite how the quarry developed.

The first quarrying was spread across several sites: Adelaide, Allt Ddu, Braich, Bryn Glas, Bryn Llys, Chwarel Fawr, Ellis, Garrett, Harriet, Matilda, Morgan's, Raven Rock, Sofia, Turner, Victoria, and Wellington.[3] This was a situation that lasted for many years, certainly until the mid-1830s.

The 1824 railway brought transport problems. Produce from the upper quarries was not a problem, but Wellington, Ellis, Turner, Harriet, and Victoria quarries were all below the level of the railway. This was a problem solved in the 1840s when the lake level railway was built, and the quarry as we know it began to take shape.

Adelaide quarry became a part of Allt Ddu, and Chwarel Fawr and Chwarel Goch became linked to it too. In the 'Great New Quarry', Raven Rock and Garret Quarries became one massive quarry, operating as an open hillside gallery quarry, with the lowest two levels being accessed by tunnels. Harriet, Morgans, and Sofia quarry are all still identifiable as separate pits today, whilst Braich quarry became a large working of three contiguous smaller pits. Below this, The galleries of Victoria and Wellington were joined along the hillside and continued downwards in two separate main workings: Wellington and Hafod Owen. Each was eventually to contain several small sinks too, some below lake level. The current form of the quarry is little different from that of the time of the Great War, save for enlarging of the actual quarry faces and deepening of the sinks. Certainly, all the main inclines were in place, very little was altered until closure.[4]

The nearby Marchlyn quarry was opened in the 1930s to provide access to the main slate vein higher up the mountain.

Closure

[edit]

The quarry closed in July 1969, the result of industrial decline and difficult slate removal.[2] During the 1950s/60s extraction had become difficult, because after 170 years of extraction many of the unsystematically dumped tips were beginning to slide into some of the major pit workings, and after an enormous fall in the Garret area of the quarry in 1966, production had ceased almost permanently. It was however decided that some final work could be done by clearing some of the waste from the Garret fall. This involved making an access road for more modern quarry vehicles across some of the terraces, to the rockfall. This amount of slate won by this method was small and all production stopped by 1969.

At the Receiver's instruction a public auction was arranged, intended to pay off some of the quarry's debts. The auctions were held on 12 and 13 December 1969. The auctioneer's national advertisement (in The Guardian 29 November 1969), the event was described as "An auction sale of machine tools and stocks, four Hunslet locos, and engine and boat fittings". The locomotives referred to, lots 613–616, were "Dolbadarn", "Red Damsel", "Wild Aster" and "Irish Mail". Before the bidding started, it was announced that Gwynedd County Council had placed a Preservation Order on the Gilfach Ddu workshops, and many items within it.

Transport

[edit]
The Vivian transporter incline, completed in 1873, and restored in 1998. The transporters run on 5 ft 6 in (1,676 mm) gauge tracks.

The original connection between the quarry and the company's port at Y Felinheli was the Dinorwic Railway, a 2 ft (610 mm) gauge line built in 1824. This was worked by horses and it soon became apparent that it was inadequate for the traffic generated by the quarry. A number of surveys of alternative routes were undertaken by members of the Spooner family, the result of which was the construction of a new railway which opened in 1848: the 4 ft (1,219 mm) gauge Padarn Railway which operated as the quarry's main transport link until closure in 1961.[2]

Tramways

[edit]

The first use of railways at the quarry came around 1800 when the first internal tramways were in use. These first lines were worked using horse- and hand- power. For the next seventy years, the tramway system grew until it reached the point where more powerful traction was required. The first steam locomotives used were small vertical boiler locos supplied by De Winton's of Caernarfon. In 1870 the first locomotive supplied by the Hunslet Engine Company arrived at the quarry, and the majority of the locomotives that worked at Dinorwic were eventually supplied by Hunslet.[2]

Between 1935 and 1949 the Quarry acquired 22 light internal combustion rail tractors for use on the levels. Half of these were new, the other half second-hand. Their survival rate did not match those of the steam locomotives, and when the quarry closed in 1969 only three still survived.

Although a nominal two-foot gauge, the actual gauge between the rails at Dinorwic was 1 ft 10+34 in (578 mm)[5] in common with its neighbour Penrhyn, but fractionally narrower than the public lines of the Ffestiniog Railway or North Wales Narrow Gauge Railway which were 1 ft 11+12 in (597 mm).

Locomotives

[edit]

Early steam locomotives were used by the quarry, and built by De Winton & Co. But from 1870 the quarry acquired most of its locomotives new from the Hunslet Engine Company of Leeds. These were purpose-built, initially using a series of Hunslet general/unclassified designs, but after 1886 these fell into one of three classes:

  • Alice
  • Port: larger and designed primarily to work at Port Dinorwic, although Michael never did.
  • Tram or Mills: worked on marshaling duties on the Padarn–Peris Tram Line, which linked the quarry mills to the Padarn Railway for transportation to Port Dinorwic.
Orig. name / number Later name Image Builder Year acquired Year sold Notes
Wellington De Winton c1870 1898
Harriet De Winton 1874 pre 1895
Peris De Winton 1875 pre 1895
Victoria De Winton 1876 pre 1895
Padarn De Winton c1898 ?
Dinorwic Charlie Hunslet 1870 by 1919
George Minstrel Park Hunslet 1877 by 1919
Louisa Hunslet 1877 by 1989
Sybil W. G. Bagnall 1906 ? Restoration project taking place at the West Lancashire Light Railway
No.70 Barclay & Sons 1931 1962
Elidir Avonside Engine 1933 1966
Velinheli Hunslet 1886 1965 Alice class
Now preserved at the Launceston Steam Railway. Currently on loan to the Ffestiniog Railway.[6]
Alice King of the Scarlets Hunslet 1889 1965 Alice class

Preserved at the Statfold Barn Railway

Enid Red Damsel later Elidir Hunslet 1889 1969 Alice class
No.1 Rough Pup Hunslet 1891 1968 Alice class

Preserved at the NGM

No.2 Cloister Hunslet 1892 1962 Alice class
preserved at the Statfold Barn Railway
The First Bernstein Hunslet 1892 1967 Alice class
The Second Covertcoat Hunslet 1898 1964 Alice class
Wellington George B. Hunslet 1898 1965 Alice class
Now at the Bala Lake Railway[7]
No.3 Holy War Hunslet 1902 1968 Alice class
No.4 Alice Hunslet 1902 1972 Alice class
No.5 Maid Marian
(briefly Covertcoat)
Hunslet 1903 1966 Alice class
No.6 Irish Mail Hunslet 1903 1969 Alice class
preserved at West Lancashire Light Railway
No.7 Wild Aster now Thomas Bach Hunslet 1904 1969 Alice class
Now running on the Llanberis Lake Railway
No.1 Lady Joan Hunslet 1922 1967 Port class
Preserved at Bredgar and Wormshill Light Railway
No.2 Dolbadarn Hunslet 1922 1969 Port class
Michael Hunslet 1932 1965 Port class

Preserved at the Statford Barn Railway

Vaenol Jerry M Hunslet 1895 1967 Tram/Mills class
Now at the Hollycombe Steam Collection
Port Dinorwic Cackler Hunslet 1898 1966 Tram/Mills class

Port Dinorwic

[edit]

Port Dinorwic (Y Felinheli) was initially only a tidal creek on the Menai Strait's mainland shore called Aber-Pwll, Moel-y-Don, or Felin Heli. The Assheton-Smith family of Vaynol established a tiny wharf on a marshy inlet to convey the output of its Dinorwic quarry in 1793, which marked the beginning of the development of the dock system and related buildings. It was located directly downstream of a tide-powered grain mill that gave the region its Welsh name, Y Felinheli, and replaced an earlier setup where slate was lightered into the Menai Straits from 500 metres to the southwest. Slates from Dinorwic quarries were hoisted onto lighters and transported to ships anchored further offshore in the Menai Strait until the quays were opened in 1809 allowing ships to be loaded directly. The name Port Dinorwic was being used by 1824, and in this year a tramroad from Dinorwic quarries (the Dinorwic Railway) was opened.

In 1848, a steam-operated railway on a new track replaced the tramroad and operated until 1961. The Padarn Railway, or the Dinorwic Quarries Railway as it was also known, belonged to the quarry company. It was constructed with a four-foot gauge but transported slate waggons with a nominal two-foot (centre-to-centre) gauge from the Gilfach-ddu quarry yard to Penscoins at the top of the escarpment with a view of Port Dinorwic. From the transporters, they were unloaded here and lowered down a self-acting incline to the port, where locomotives moved them to the quays. Despite the fact that these locos were close to but not identical to those employed in the quarry, they were occasionally moved between places. The  buffer beams on the port locos caused particular difficulties when trying to get them up the inclines to the higher levels of the quarry, but it was achieved.

Docks and quays were constructed in 1809, lock gates were added in 1828, dry docks and engineering facilities were built in the 1830s, a new outer basin was finished in 1854, an outer lock was added in 1897, and a new sea wall was built in 1905 between the harbour and basin to extend the quays. In 1852, a standard gauge extension of the Chester and Holyhead Railway reached Port Dinorwic, although nearly 90% of the slate continued to be transported by sea, exclusively in rented vessels. The dry dock was a unique facility in North Wales, making it very valuable to coastal shipping while the vessels were there. The engineering shops of The Dry Dock Co. also were looking to have Merddin Emrys's boiler repaired with new copper fireboxes and retubing the FR Co. got estimates from Avonside Engine Company of Bristol and the Quarry Engineering Works at Port Dinorwic. The boiler was eventually sent to Bristol to get the work done.

In 1892, the first steamship owned by a quarry was purchased. Port Dinorwic was never the fully developed maritime community of the nineteenth century that Porthmadog was, in part because it shared ownership with the Quarry and was devoted to its commerce. For instance, it lacked a sizable shipbuilding sector, and the surveyor for ship insurance in Port Dinorwic worked for the Portmadoc Mutual Ship Insurance Society. The organisation has no less than thirteen surveyors working in Porthmadog! Other visiting steamers that were not owned by the quarry were nevertheless crucial after the First World War. The ships owned by Dinorwic Quarry were underrepresented in a 1925 photograph of coastal steamers.

Post-closure

[edit]

National Slate Museum

[edit]
Welsh Slate Museum located in Gilfach Ddu

Following closure, the quarry's workshop at Gilfach Ddu was acquired by the then Caernarfonshire County Council, who now lease the building to the National Museum and Galleries of Wales. It now houses the National Slate Museum. Equipment from the internal quarry railway was used to build the Llanberis Lake Railway over part of the trackbed of the Padarn Railway. The quarry has been partly used by the Dinorwig power station, a pumped storage hydroelectric scheme. Many of the Hunslet locomotives have been preserved on several of Britain's narrow gauge heritage railways. More recently, new build versions of the class have been built by the Exmoor Steam Railway, and by a new Hunslet company at the Statfold Barn Railway.

Film location

[edit]

In 1987, part of the film Willow was shot in the Dinorwic quarry, on the lower terraces next to the pumped-storage scheme. Scenes from the 1994 film Street Fighter were filmed on the south side of "Watford Gap" near the Matilda hole.[8] Clash of the Titans was filmed in the quarry in 2009.[9]

Rock climbing

[edit]
Rock climbing in the Dinorwic quarry
Johnny Dawes on Poetry Pink (E5 6b), Rainbow Slab
Angus Killie on The Meltdown (9a), Twll Mawr

The Dinorwic quarry has also become a major British rock climbing venue, particularly the sections of Twll Mawr (meaning "big hole"), Vivian quarry, Rainbow Slab, and Australia. Famous British rock climbers such as Johnny Dawes have created well-known extreme test-pieces such as the traditional climbing route The Quarryman (E8 7a) in the Twll Mawr section, and the sport climbing route The Very Big & the Very Small 8b+ (5.14a) in the Rainbow Slab section, of the Dinorwic quarry.[10] The most famous route is Stevie Haston's Comes the Dervish (E3 5c) in the Vivian quarry section,[11] and the hardest route is currently James McHaffie's sport climbing route, The Meltdown at 9a (5.14d) (previously bolted and attempted by Dawes and Jerry Moffatt), also in the Twll Mawr section.[10]

Scuba diving

[edit]

The Vivian quarry section is also used for diving, with good visibility and depths ranging from 6–18 metres (20–59 ft), a platform at 6 metres (20 ft), plus flooded buildings, boats, a van and a gnome garden.

References

[edit]
  1. ^ Jones, R. Merfyn. 1981. The North Wales quarrymen, 1874-1922, Studies in Welsh history 4. University of Wales Press; ISBN 0-7083-0776-0
  2. ^ a b c d Carrington D.C. and Rushworth T.F. (1972). Slates to Velinheli: The Railways and Tramways of Dinorwic Slate Quarries, Llanberis and the Llanberis Lake Railway. Maid Marian Locomotive Fund.
  3. ^ G.A.S. Vanol 4190
  4. ^ Ordnance Survey Caernarvonshire 25" plan 1914
  5. ^ "Industrial Railways – Dinorwic Quarries and Padarn Railway". Narrow Gauge Railway Museum. Archived from the original on 16 May 2021.
  6. ^ O'Mahoney, Charlie (19 February 2018). "A new boiler for Velinheli". Launceston Steam Railway. Archived from the original on 6 February 2022.
  7. ^ "Hunslet Company to work on 1898 Hunslet loco". The Railway Magazine. Vol. 151. IPC Business Press. 2005.
  8. ^ "Must see film and TV locations in Wales". Visit Wales. 2022. Archived from the original on 10 November 2021.
  9. ^ "Clash of the Titans to be filmed at Llanberis quarry". Daily Post. 18 June 2009. Archived from the original on 25 September 2020.
  10. ^ a b Geldard, Jack (10 July 2012). "James McHaffie Climbs 'The Meltdown' - 9a Slab". UKClimbing. Retrieved 7 February 2022.
  11. ^ Fortune, Sean (17 July 2019). "Comes The Dervish, E3 5c". UKClimbing. Retrieved 7 February 2022.

Sources

[edit]
[edit]