Tamil Nadu Generation and Distribution Corporation
This article needs additional citations for verification. (September 2019) |
Company type | Public Sector Undertaking |
---|---|
Industry | Electric utility |
Predecessor | Tamil Nadu Electricity Board |
Founded | 1 November 2010 |
Headquarters | , |
Area served | Tamil Nadu |
Key people | Rajesh Lakhoni, IAS (Chairman & MD) |
Products | Electric power |
Services | Electricity generation Electricity distribution |
Revenue | ₹65,177.10 crore (equivalent to ₹770 billion or US$9.2 billion in 2023) (2019–20)[1] |
₹56,295.39 crore (equivalent to ₹660 billion or US$7.9 billion in 2023) (2019–20)[1] | |
₹−11,964.93 crore (equivalent to ₹−140 billion or US$−1.7 billion in 2023) (2019–20)[1] | |
Total assets | ₹146,429.12 crore (equivalent to ₹1.7 trillion or US$21 billion in 2023) (2019–20)[2] |
Owner | Government of Tamil Nadu |
Parent | TNEB Limited |
Divisions | Electricity Generation Wing Electricity Distribution Wing |
Website | www |
The Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) is an electrical power generation and distribution public sector undertaking owned by the Government of Tamil Nadu. It was formed on 1 November 2010 under section 131 of the Electricity Act of 2003, and is the successor to the erstwhile Tamil Nadu Electricity Board. The electricity board's generation and distribution wings are its nucleus.[3] TANGEDCO is a subsidiary of TNEB Limited. From July 13 2024, TANGEDCO has been trifurcated into 3 organizations namely Tamil Nadu Power Generation Corporation Limited (TNPGCL), Tamil Nadu Power Distribution Corporation Limited (TNPDCL), Tamil Nadu Green Energy Corporation Limited (TNGECL).[4]
Operation
[edit]Generation
[edit]To satisfy the energy needs of the state, Tamil Nadu Electricity Board has a total installed capacity of 10,214 MW which includes shares from the State government, Central government and Independent power producers. The state also has installations with renewable energy sources such as windfarms that supply up to 4,300 MW. Due to the astronomical increase in energy demand in recent years, the state has a power deficit which is estimated to be approx. 11.9% as of Feb 2009. To meet the ever-increasing energy demand, TNEB has proposed a number of next-generation projects to be constructed over the next 5 years.
The company operates four large thermal power stations:
- Ennore Thermal Power Station (ETPS) - 450 MW (2x60, 3x110 MW)
- Mettur Thermal Power Station (MTPS) - 1440 MW (4x210, 1x600 MW)
- North Chennai Thermal Power Station (NCTPS) 1830 MW (3x210 MW, 2x600 MW)
- Tuticorin Thermal Power Station (TTPS) - 1050 MW (5x210 MW)
The Company Operates large Wind Power Stations:
- Siemens, GE, Enercon, Sulzon Group, Goldwind, Vestas – Tamil Nadu's wind power capacity is around 29% of India's total. The Government of Tamil Nadu realized the importance and need for renewable energy, and set up a separate Agency, as registered society, called the Tamil Nadu Energy Development Agency (TEDA) as early as 1985. Now, Tamil Nadu has become a leader in Wind Power in India. In Muppandal windfarm the total capacity is 3500 MW, the largest wind power plant in India. The total wind installed capacity is 7684 MW from 13,69,856 wind turbines (As per 2013 survey from TEDA). During the fiscal year 2016-17, the electricity generation is 9.521 GWh, with about a 15% capacity utilization factor.
Distribution
[edit]TNEB has a consumer base of about 20 million consumers. 100% rural electrification has been achieved. The per capita consumption of Tamil Nadu is 1000 units. To achieve the goal of electrification of all households, the Government has launched the Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) scheme, where, if grid connectivity is not feasible or not cost effective, then "Decentralized Distributed Generation" is permitted. Even when Tamil Nadu had an option to share the electricity with neighbouring States it never happened.
The Ministry of Power has launched the restructured Accelerated Power Development and Reforms Programme scheme under the 11th five-year plan. The plan is expected to achieve a reliable and quality power supply and to minimize the loss of energy.
New Projects
[edit]- Uppur Thermal Power Project(2 × 800 MW)
- North Chennai Thermal Power Station Stage III Thermal Power Project (1 × 800 MW)
- North Chennai Thermal Power Station Stage – IV (2 × 800 MW)
- Tuticorin Thermal Power Station (1 × 800 MW)
- Udangudi STPP Stage-I (2 × 660 MW)
- Ennore SEZ STPP (2 × 660 MW)[5]
References
[edit]- ^ a b c ""Profit and Loss 2019-2021"" (PDF). Tamil Nadu Generation and Distribution Corporation. Retrieved 14 October 2021.
- ^ "Balance Sheet 2019-2021" (PDF). Tamil Nadu Generation and Distribution Corporation. Retrieved 14 October 2021.
- ^ "Formation of TANGEDCO". TANGEDCO. Retrieved 4 June 2012.
- ^ Service, Express News (13 July 2024). "Tangedco's trifurcation gets centre's approval". The New Indian Express. Retrieved 26 November 2024.
- ^ "Uppur Thermal Power Project (2 x 800 MW)" (PDF). Archived from the original (PDF) on 10 March 2016.
External links
[edit]- Electric power distribution network operators in India
- Electric-generation companies of India
- Energy in Tamil Nadu
- State agencies of Tamil Nadu
- State electricity agencies of India
- Indian companies established in 2010
- Energy companies established in 2010