Jump to content

RBMK

From Wikipedia, the free encyclopedia
(Redirected from RBMK reactor)
RBMK reactor class
View of the Smolensk Nuclear Power Plant site, with three operational RBMK-1000 reactors. A fourth reactor was cancelled before completion.
GenerationGeneration II reactor
Reactor conceptGraphite-moderated light water-cooled reactor
Reactor lineRBMK (Reaktor Bolshoy Moshchnosti Kanalniy)
Reactor typesRBMK-1000
RBMK-1500
RBMKP-2400 (never built)
Status26 blocks:
  • 7 operational
  • 1 involved in accident
  • 1 partially damaged
  • 9 cancelled
  • 10 decommissioned
  • 3 small EGP-6 graphite moderated BWR operational
(as of December 2021)[1][2]
Main parameters of the reactor core
Fuel (fissile material)235U (NU/SEU/LEU)
Fuel stateSolid
Neutron energy spectrumThermal
Primary control methodControl rods
Primary moderatorGraphite
Primary coolantLiquid (light water)
Reactor usage
Primary useGeneration of electricity
Power (thermal)RBMK-1000: 3,200 MWth
RBMK-1500: 4,800 MWth
RBMKP-2400: 6,500 MWth
Power (electric)RBMK-1000: 1,000 MWe
RBMK-1500: 1,500 MWe
RBMKP-2400: 2,400 MWe

The RBMK (Russian: реа́ктор большо́й мо́щности кана́льный, РБМК; reaktor bolshoy moshchnosti kanalnyy, "high-power channel-type reactor") is a class of graphite-moderated nuclear power reactor designed and built by the Soviet Union. It is somewhat like a boiling water reactor as water boils in the pressure tubes. It is one of two power reactor types to enter serial production in the Soviet Union during the 1970s, the other being the VVER reactor.[3] The name refers to its design[3] where instead of a large steel pressure vessel surrounding the entire core, the core is surrounded by a cylindrical annular steel tank inside a concrete vault and each fuel assembly is enclosed in an individual 8 cm (inner) diameter pipe (called a "technological channel"). The channels also contain the coolant, and are surrounded by graphite.

The RBMK is an early Generation II reactor and the oldest commercial reactor design still in wide operation. Certain aspects of the original RBMK reactor design had several shortcomings,[3] such as the large positive void coefficient, the 'positive scram effect' of the control rods[4] and instability at low power levels—which contributed to the 1986 Chernobyl disaster, in which an RBMK experienced an uncontrolled nuclear chain reaction, leading to a steam and hydrogen explosion, large fire, and subsequent core meltdown. Radioactive material was released over a large portion of northern and southern Europe—including Sweden—where evidence of the nuclear disaster was first registered outside of the Soviet Union, and before the Chernobyl accident was finally communicated by the Soviet Union to the rest of the world.[5][6] The disaster prompted worldwide calls for the reactors to be completely decommissioned; however, there is still considerable reliance on RBMK facilities for power in Russia. Most of the flaws in the design of RBMK-1000 reactors were corrected after the Chernobyl accident and a dozen reactors have since been operating without any serious incidents for over thirty years.[7]

RBMK reactors may be classified as belonging to one of three distinct generations, according to when the particular reactor was built and brought online:[3][8]

  • Generation 1 – during the early-to-mid 1970s, before OPB-82 General Safety Provisions were introduced in the Soviet Union.
  • Generation 2 – during the late 1970s and early 1980s, conforming to the OPB-82 standards issued in 1982.
  • Generation 3 – post Chernobyl accident in 1986, where Soviet safety standards were revised to OPB-88; only Smolensk-3 was built to these standards.

Nine RBMK blocks under construction were cancelled after the Chernobyl disaster, and the last of three remaining RBMK blocks at the Chernobyl Nuclear Power Plant was shut down in 2000.

As of April 2024, there are still seven RBMK reactors (Leningrad units 3 & 4; Smolensk units 1,2,3; Kursk units 3 & 4), and three small EGP-6 graphite moderated light-water reactors (Bilibino units 2,3,4) operating in Russia.[1][9] All have been retrofitted with a number of safety updates. Only two RBMK blocks were started after 1986: Ignalina-2 (located in Lithuania, now decommissioned) and Smolensk-3.

History

[edit]

The RBMK was the culmination of the Soviet nuclear power program to produce a water-cooled power reactor with dual-use potential based on their graphite-moderated plutonium production military reactors. The first of these, Obninsk AM-1 ("Атом Мирный", Atom Mirny, Russian for "peaceful atom," analogous to the American Atoms for Peace) generated 5 MW of electricity from 30 MW thermal power, and supplied Obninsk from 1954 until 1959. Subsequent prototypes were the AMB-100 reactor and AMB-200 reactor both at Beloyarsk Nuclear Power Station.

By using a minimalist design that used regular (light) water for cooling and graphite for moderation, it was possible to use fuel with a lower enrichment (1.8% enriched uranium instead of considerably more expensive 4% enrichment). This allowed for an extraordinarily large and powerful reactor that could be built rapidly, largely out of parts fabricated on-site instead of by specialized factories. The initial 1000 MWe design also left room for development into yet more powerful reactors. For example, the RBMK reactors at the Ignalina Nuclear Power Plant in Lithuania were rated at 1500 MWe each, a very large size for the time and even for the early 21st century. For comparison, the EPR has a net electric nameplate capacity of 1600 MW (4500 MWthermal) and is among the most powerful reactor types ever built.

The RBMK-1000's design was finalized in 1968. At that time it was the world's largest nuclear reactor design, surpassing western designs and the VVER (an earlier Soviet PWR reactor design) in power output and physical size, being 20 times larger by volume than contemporary western reactors. Similarly to CANDU reactors it could be produced without the specialized industry required by the large and thick-walled reactor pressure vessels such as those used by VVER reactors, thus increasing the number of factories capable of manufacturing RBMK reactor components. No prototypes of the RBMK were built; it was put directly into mass production.

The RBMK was proclaimed by some as the national reactor of the Soviet Union, probably due to nationalism because of its unique design, large size and power output. Meanwhile the VVER design was called the "American reactor" due to the pressurized water (PWR) design shared with many Western reactors. A top-secret invention patent for the RBMK design was filed by Anatoly Aleksandrov from the Kurchatov Institute of Atomic Energy, who personally took credit for the design of the reactor, with the Soviet patent office. Because a containment building would have needed to be very large and expensive, doubling the cost of each unit, due to the large size of the RBMK, it was originally omitted from the design. It was argued by its designers that the RBMK's strategy of having each fuel assembly in its own channel with flowing cooling water, was an acceptable alternative for containment.

The RBMK was mainly designed at the Kurchatov Institute of Atomic Energy and NIKIET [ru], headed by Anatoly Aleksandrov and Nikolai Dollezhal respectively, from 1964 to 1966. The RBMK was favored over the VVER by the Soviet Union due to its ease of manufacture, due to a lack of a large and thick-walled reactor pressure vessel and relatively complex associated steam generators, and its large power output, which would allow the Soviet government to easily meet their central economic planning targets.[10]

The flaws in the original RBMK design were recognized by others, including from within the Kurchatov Institute before the first units were built, but the orders for construction of the first RBMK units, which were at Leningrad, had already been issued in 1966 by the Soviet government by the time their concerns reached the Central Committee of the Communist Party of the Soviet Union and the Soviet Council of Ministers. This prompted a sudden overhaul of the RBMK. Plutonium production in an RBMK would have been achieved by operating the reactor under special thermal parameters, but this capability was abandoned early on.[11] This was the design that was finalized in 1968. The redesign did not solve further flaws that were not discovered until years later. Construction of the first RBMK, which was at Leningrad Nuclear Power Plant, began in 1970. Leningrad unit 1 opened in 1973.

At Leningrad it was discovered that the RBMK, due to its high positive void coefficient, became harder to control as the uranium fuel was consumed or burned up, becoming unpredictable by the time it was shut down after three years for maintenance. This made controlling the RBMK a very laborious, mentally and physically demanding task requiring the timely adjustment of dozens of parameters every minute, around the clock, constantly wearing out switches such as those used for the control rods and causing operators to sweat. The enrichment percentage was increased to 2.0%, up from 1.8% to alleviate these issues.

The RBMK was considered by some in the Soviet Union to be already obsolete shortly after the commissioning of Chernobyl unit 1. Aleksandrov and Dollezhal did not investigate further or even deeply understand the problems in the RBMK, and the void coefficient was not analyzed in the manuals for the reactor. Engineers at Chernobyl unit 1 had to create solutions to many of the RBMK's flaws such as a lack of protection against no feedwater supply. Leningrad and Chernobyl units 1 both had partial meltdowns that were treated, alongside other nuclear accidents at power plants, as state secrets and so were unknown even to other workers at those same plants.

By 1980 NIKIET realized, after completing a confidential study, that accidents with the RBMK were likely even during normal operation, but no action was taken to correct the RBMK's flaws. Instead, manuals were revised, which was believed to be enough to ensure safe operation as long as they were followed closely. However, the manuals were vague and Soviet power plant staff already had a habit of bending the rules in order to meet economic targets, despite inadequate or malfunctioning equipment. Crucially, it was not made clear that a number of control rods had to stay in the reactor at all times in order to protect against an accident, as loosely articulated by the Operational Reactivity Margin (ORM) parameter.[12] An ORM chart recorder and display were added to RBMK control rooms after the Chernobyl disaster.

Initially the service life was expected to be 30 years, later it was extended to a 45-year lifetime with mid-life refurbishments (such as fixing the issue of the graphite stack deformation), eventually 50 years lifetime was adopted for some units such as Kursk 1-3 and 1-4 (no plans to extend further due to condition of non-replaceable elements).[13][14]

Reactor design and performance

[edit]

Reactor vessel, moderator and shielding

[edit]
Schematic diagram of an RBMK
Schematic side view of the layout of an RBMK reactor core
The reactor hall and piping systems of the RBMK reactor.

The reactor pit or vault is made of reinforced concrete and has dimensions 21.6m × 21.6m × 25.5m. It houses the vessel of the reactor, which is annular, made of an inner and outer cylindrical wall and top and bottom metal plates that cover the space between the inner and outer walls, without covering the space surrounded by the vessel. The reactor vessel is an annular steel cylinder with hollow walls and pressurized with nitrogen gas, with an inner diameter and height of 14.52m × 9.7m, and a wall thickness of 16mm.

In order to absorb axial thermal expansion loads, it is equipped with two bellows compensators, one on the top and another on the bottom, in the spaces between the inner and outer walls. The vessel surrounds the graphite core block stack, which serves as moderator. The graphite stack is kept in a helium-nitrogen mixture, providing an inert atmosphere for the graphite, protecting it from potential fires, and facilitating transfer of excess heat from the graphite to the coolant channels.

The moderator blocks are made of nuclear graphite the dimensions of which are 25 cm × 25 cm on the plane perpendicular to the channels, and with several longitudinal dimensions of between 20 cm and 60 cm depending on the location in the stack. There are holes of 11.4 cm diameter through the longitudinal axis of the blocks for the fuel and control channels. The blocks are stacked, surrounded by the reactor vessel into a cylindrical core with a diameter and height of 14m × 8m.[15] The maximum allowed temperature of the graphite is up to 730 °C.[16]

The reactor has an active core region 11.8 meters in diameter by 7 meters height. There are 1700 tons of graphite blocks in an RBMK-1000 reactor.[12] The pressurized nitrogen in the vessel prevents the escape of the helium-nitrogen mixture used to cool the graphite stack.

The reactor vessel has on its outer side an integral cylindrical annular water tank,[17] a welded structure with 3 cm thick walls, an inner diameter of 16.6m and an outer diameter of 19m, internally divided to 16 vertical compartments. The water is supplied to the compartments from the bottom and removed from the top; the water can be used for emergency reactor cooling. The tank contains thermocouples for sensing the water temperature and ion chambers for monitoring the reactor power.[18] The tank, along with an annular sand layer between the outer side of the tank and inner side of the pit,[12] and the relatively thick concrete of the reactor pit serve as lateral biological shields.

Reactor hall of the RBMK-1500 at Ignalina Nuclear Power Plant, Lithuania—the upper biological shield (UBS) lies several meters below the floor of the reactor hall. There are no channel covers on the fuel channels of the reactor; the control rod drives are below the colored covers.
RBMK reactor with fuel channel covers

The top of the reactor is covered by the upper biological shield (UBS), also called "Schema E", or, after the explosion (of Chernobyl Reactor 4), Elena. The UBS is a cylindrical disc of 3m x 17m in size and 2000 tons in weight.[12] It is penetrated by standpipes for fuel and control channel assemblies. The top and bottom are covered with 4 cm thick steel plates, welded to be helium-tight, and additionally joined by structural supports. The space between the plates and pipes is filled with serpentinite,[12] a rock containing significant amounts of bound water. The serpentinite provides the radiation shielding of the biological shield and was applied as a special concrete mixture. The disk is supported on 16 rollers, located on the upper side of the reinforced cylindrical water tank. The structure of the UBS supports the fuel and control channels, the floor above the reactor in the central hall, and the steam-water pipes.[18][19]

Below the bottom of the reactor core there is the lower biological shield (LBS), similar to the UBS, but only 2m x 14.5m in size. It is penetrated by the tubes for the lower ends of the pressure channels and carries the weight of the graphite stack and the coolant inlet piping. A steel structure, two heavy plates intersecting in right angle under the center of the LBS and welded to the LBS, supports the LBS and transfers the mechanical load to the building.[19]

Above the UBS, there is a space with upper channel piping and instrumentation and control (I&C) or control and monitoring cabling. Above that is Assembly 11, made up of the upper shield cover or channel covers. Their top surfaces form part of the floor of the reactor hall and serve as part of the biological shield and for thermal insulation of the reactor space. They consist of serpentinite concrete blocks that cover individual removable steel-graphite plugs, located over the tops of the channels, forming what resembles a circle with a grid pattern.[19] The floor above the reactor is thus known by RBMK plant workers as pyatachok, referring to the five-kopeck coin.[12] There is one cover (lid/block) per plug, and one plug per channel.

Fuel channels

[edit]

The fuel channels consist of welded zircaloy pressure tubes 8 cm in inner diameter with 4mm thick walls, led through the channels in the center of the graphite moderator blocks. The top and bottom parts of the tubes are made of stainless steel, and joined with the central zircaloy segment with zirconium-steel alloy couplings. The pressure tube is held in the graphite stack channels with two alternating types of 20mm high split graphite rings. One is in direct contact with the tube and has 1.5mm clearance to the graphite stack, the other one is directly touching the graphite stack and has 1.3mm clearance to the tube. This assembly reduces transfer of mechanical loads caused by neutron-induced swelling, thermal expansion of the blocks, and other factors to the pressure tube, while facilitating heat transfer from the graphite blocks. The pressure tubes are welded to the top and bottom plates of the reactor vessel.[19]

While most of the heat energy from the fission process is generated in the fuel rods, approximately 5.5% is deposited in the graphite blocks as they moderate the fast neutrons formed from fission. This energy must be removed to avoid overheating the graphite. About 80–85% of the energy deposited in the graphite is removed by the fuel rod coolant channels, using conduction via the graphite rings. The rest of the graphite heat is removed from the control rod channels by forced gas circulation through the gas circuit.[20]

There are 1693 fuel channels and 170 control rod channels in the first generation RBMK reactor cores. Second generation reactor cores (such as Kursk and Chernobyl 3/4) have 1661 fuel channels and 211 control rod channels.[21] The fuel assembly is suspended in the fuel channel on a bracket, with a seal plug. The seal plug has a simple design, to facilitate its removal and installation by the remotely controlled online refueling machine.

The fuel channels may, instead of fuel, contain fixed neutron absorbers, or be filled completely with cooling water. They may also contain silicon-filled tubes in place of a fuel assembly, for the purpose of doping for semiconductors. These channels could be identified by their corresponding servo readers, which would be blocked and replaced with the atomic symbol for silicon.

The small clearance between the pressure channel and the graphite block makes the graphite core susceptible to damage. If a pressure channel deforms, e.g. by too high an internal pressure, the deformation can cause significant pressure loads on the graphite blocks and lead to damage.

Fuel

[edit]
RBMK reactor fuel rod holder 1 – distancing armature; 2 – fuel rods shell; 3 – fuel tablets.
RBMK reactor fuel rod holder Uranium fuel pellets, fuel tubes, distancing armature, graphite bricks.

The fuel pellets are made of uranium dioxide powder, sintered with a suitable binder into pellets 11.5 mm in diameter and 15 mm long. The material may contain added europium oxide as a burnable nuclear poison to lower the reactivity differences between a new and partially spent fuel assembly.[22] To reduce thermal expansion issues and interaction with the cladding, the pellets have hemispherical indentations. A 2 mm hole through the axis of the pellet serves to reduce the temperature in the center of the pellet and facilitates removal of gaseous fission products. The enrichment level in 1980 was 2% (0.4% for the end pellets of the assemblies). Maximum allowable temperature of the fuel pellet is 2100 °C.

The fuel rods are zircaloy (1% niobium) tubes 13.6 mm in outer diameter, 0.825 mm thick. The rods are filled with helium at 0.5 MPa and hermetically sealed. Retaining rings help to seat the pellets in the center of the tube and facilitate heat transfer from the pellet to the tube. The pellets are axially held in place by a spring. Each rod contains 3.5 kg of fuel pellets. The fuel rods are 3.64 m long, with 3.4 m of that being the active length. The maximum allowed temperature of a fuel rod is 600 °C.[20]

The fuel assemblies consist of two sets ("sub-assemblies") with 18 fuel rods and 1 carrier rod. The fuel rods are arranged along the central carrier rod, which has an outer diameter of 1.3 cm. All rods of a fuel assembly are held in place with 10 stainless steel spacers separated by 360 mm distance. The two sub-assemblies are joined with a cylinder at the center of the assembly; during the operation of the reactor, this dead space without fuel lowers the neutron flux in the central plane of the reactor. The total mass of uranium in the fuel assembly is 114.7 kg. The fuel burnup is 20 MW·d/kg. The total length of the fuel assembly is 10.025 m, with 6.862 m of the active region.

In addition to the regular fuel assemblies, there are instrumented ones, containing neutron flux detectors in the central carrier. In this case, the rod is replaced with a tube with wall thickness of 2.5 mm; and outer diameter of 15 mm.[23]

Unlike the rectangular PWR/BWR fuel assemblies or hexagonal VVER fuel assemblies, the RBMK fuel assembly is cylindrical to fit the round pressure channels.

The refueling machine is mounted on a gantry crane and remotely controlled. The fuel assemblies can be replaced without shutting down the reactor, a factor significant for production of weapon-grade plutonium and, in a civilian context, for better reactor uptime. When a fuel assembly has to be replaced, the machine is positioned above the fuel channel: then it mates to the latter, equalizes pressure within, pulls the rod, and inserts a fresh one. The spent rod is then placed in a cooling pond. The capacity of the refueling machine with the reactor at nominal power level is two fuel assemblies per day, with peak capacity of five per day.

The total amount of fuel under stationary conditions is 192 tons.[21] The RBMK core has a relatively low power density at least partly due to the 25 cm spacing between channels and thus fuel assemblies.

Control rods

[edit]
Schematic plan view of core layout, Chernobyl RBMK reactor No. 4. (Quantity of each rod type in parentheses):
  neutron detector (12)
  control rods (167)
  short control rods from below reactor (32)
  automatic control rods (12)
  pressure tubes with fuel rods (1661-1691)(1-2-nd generation cores(RBMK)
The numbers in the image indicate the position of the respective control rods (insertion depth in centimetres) at 01:22:30am [24] 78 seconds before the reactor exploded.

Most of the reactor control rods are inserted from above; 24 shortened rods are inserted from below and are used to augment the axial power distribution control of the core. With the exception of 12 automatic rods, the control rods have a 4.5 m (14 ft 9 in) long graphite section at the end, separated by a 1.25 m (4 ft 1 in) long telescope (which creates a water-filled space between the graphite and the absorber), and a boron carbide neutron absorber section. The role of the graphite section, known as "displacer", is to enhance the difference between the neutron flux attenuation levels of inserted and retracted rods, as the graphite displaces water that would otherwise act as a neutron absorber, although much weaker than boron carbide. A control rod channel filled with graphite absorbs fewer neutrons than when filled with water, so the difference between inserted and retracted control rod is increased.

When the control rod is fully retracted, the graphite displacer is located in the middle of the core height, with 1.25 m of water at each of its ends. The displacement of water in the lower 1.25 m of the core as the rod moves down could cause a local increase of reactivity in the bottom of the core as the graphite part of the control rod passes that section. This "positive scram" effect was discovered in 1983 at the Ignalina Nuclear Power Plant. The control rod channels are cooled by an independent water circuit and kept at 40–70 °C (104–158 °F).

The narrow space between the rod and its channel hinders water flow around the rods during their movement and acts as a fluid damper, which is the primary cause of their slow insertion time (nominally 18–21 seconds for the reactor control and protection system rods, or about 0.4 m/s). After the Chernobyl disaster, the control rod servos on other RBMK reactors were exchanged to allow faster rod movements, and even faster movement was achieved by cooling of the control rod channels by a thin layer of water between an inner jacket and the Zircaloy tube of the channel while letting the rods themselves move in gas.

The division of the control rods between manual and emergency protection groups was arbitrary; the rods could be reassigned from one system to another during reactor operation without technical or organizational problems.

Additional static boron-based absorbers are inserted into the core when it is loaded with fresh fuel. About 240 absorbers are added during initial core loading. These absorbers are gradually removed with increasing burnup. The reactor's void coefficient depends on the core content; it ranges from negative with all the initial absorbers to positive when they are all removed.

The normal reactivity margin is 43–48 control rods.

Gas circuit

[edit]

The reactor operates in a heliumnitrogen atmosphere (70–90% He, 10–30% N2 by volume).[20] The gas circuit is composed of a compressor, aerosol and iodine filters, adsorber for carbon dioxide, carbon monoxide, and ammonia, a holding tank for allowing the gaseous radioactive products to decay before being discharged, an aerosol filter to remove solid decay products, and a ventilator stack, the iconic chimney above the space between reactors in second generation RBMKs such as Kursk and Chernobyl 3/4 or some distance away from the reactors in first generation RBMKs such as Kursk and Chernobyl 1/2.[25]

The gas is injected to the core stack from the bottom in a low flow rate, and exits from the standpipe of each channel via an individual pipe. The moisture and temperature of the outlet gas is monitored; an increase of them is an indicator of a coolant leak.[16] A single gas circuit serves two RBMK-1000 reactors or a single RBMK-1500; RBMK reactors were always built in pairs. The gas circuit is housed between two reactors in second generation RBMKs such as Chernobyl 3/4, Kursk 3/4 and Smolensk 1–4.

Primary coolant circuit

[edit]
Schematic view of the cooling system and turbogenerators of a RBMK power plant.
Circulation system of the RBMK illustrating the Steam separators (red), Pumps (yellow) and pipe network.

The reactor has two independent cooling circuits, each having four main circulating pumps (three operating, one standby) that service one half of the reactor. The cooling water is fed to the reactor through lower water lines to a common pressure header (one for each cooling circuit), which is split to 22 group distribution headers, each feeding 38–41 pressure channels through the core, where the coolant boils. The mixture of steam and water is led by the upper steam lines, one for each pressure channel, from the reactor top to the steam separators, pairs of thick horizontal drums located in side compartments above the reactor top; each has 2.8 m (9 ft 2 in) diameter, 31 m (101 ft 8 in) length, wall thickness of 10 cm (3.9 in), and weighs 240 t (260 short tons).[15]

Steam, with steam quality of about 15%, is taken from the top of the separators by two steam collectors per separator, combined, and led to two turbogenerators in the turbine hall, then to condensers, reheated to 165 °C (329 °F), and pumped by the condensate pumps to deaerators, where remains of gaseous phase and corrosion-inducing gases are removed. The resulting feedwater is led to the steam separators by feedwater pumps and mixed with water from them at their outlets. From the bottom of the steam separators, the feedwater is led by 12 downpipes (from each separator) to the suction headers of the main circulation pumps, and back into the reactor.[26] There is an ion exchange system included in the loop to remove impurities from the feedwater.

The turbine consists of one high-pressure rotor (cylinder) and four low-pressure ones. Five low-pressure separators-preheaters are used to heat steam with fresh steam before being fed to the next stage of the turbine. The uncondensed steam is fed into a condenser, mixed with condensate from the separators, fed by the first-stage condensate pump to a chemical (ion-exchange) purifier, then by a second-stage condensate pump to four deaerators where dissolved and entrained gases are removed; deaerators also serve as storage tanks for feedwater. From the deaerators, the water is pumped through filters and into the bottom parts of the steam separator drums.[27]

The main circulating pumps have the capacity of 5,500–12,000 m3/h and are powered by 6 kV electric motors. The normal coolant flow is 8000 m3/h per pump; this is throttled down by control valves to 6,000–7,000 m3/h when the reactor power is below 500 MWt. Each pump has a flow control valve and a backflow preventing check valve on the outlet, and shutoff valves on both inlet and outlet. Each of the pressure channels in the core has its own flow control valve so that the temperature distribution in the reactor core can be optimized. Each channel has a ball type flow meter.

The nominal coolant flow through the reactor is 46,000–48,000 m3/h. The steam flow at full power is 5,440–5,600 t (6,000–6,170 short tons)/h.[16]

The nominal temperature of the coolant at the inlet of the reactor is about 265–270 °C (509–518 °F) and the outlet temperature 284 °C (543 °F), at pressure in the drum separator and reactor of 6.9 megapascals (69 bar; 1,000 psi).[16][12] The pressure and the inlet temperature determine the height at which the boiling begins in the reactor; if the coolant temperature is not sufficiently below its boiling point at the system pressure, the boiling starts at the very bottom part of the reactor instead of its higher parts. With few absorbers in the reactor core, such as during the Chernobyl accident, the positive void coefficient of the reactor makes the reactor very sensitive to the feedwater temperature. Bubbles of boiling water lead to increased power, which in turn increases the formation of bubbles.

If the coolant temperature is too close to its boiling point, cavitation can occur in the pumps and their operation can become erratic or even stop entirely. The feedwater temperature is dependent on the steam production; the steam phase portion is led to the turbines and condensers and returns significantly cooler (155–165 °C (311–329 °F)) than the water returning directly from the steam separator (284 °C). At low reactor power, therefore, the inlet temperature may become dangerously high. The water is kept below the saturation temperature to prevent film boiling and the associated drop in heat transfer rate.[15]

The reactor is tripped in cases of high or low water level in the steam separators (with two selectable low-level thresholds); high steam pressure; low feedwater flow; loss of two main coolant pumps on either side. These trips can be manually disabled.[18]

The level of water in the steam separators, the percentage of steam in the reactor pressure tubes, the level at which the water begins to boil in the reactor core, the neutron flux and power distribution in the reactor, and the feedwater flow through the core have to be carefully controlled. The level of water in the steam separator is mainly controlled by the feedwater supply, with the deaerator tanks serving as a water reservoir.

The maximum allowed heat-up rate of the reactor and the coolant is 10 °C (18 °F)/h; the maximum cool-down rate is 30 °C (54 °F)/h.[16]

ECCS

[edit]

The reactor is equipped with an emergency core cooling system (ECCS), consisting of dedicated water reserve tank, hydraulic accumulators, and pumps. ECCS piping is integrated with the normal reactor cooling system. The ECCS has three systems, connected to the coolant system headers. In case of damage, the first ECCS subsystem provides cooling for up to 100 seconds to the damaged half of the coolant circuit (the other half is cooled by the main circulation pumps), and the other two subsystems then handle long-term cooling of the reactor.[18]

The short-term ECCS subsystem consists of two groups of six accumulator tanks, containing water blanketed with nitrogen under pressure of 10 megapascals (1,500 psi), connected by fast-acting valves to the reactor. Each group can supply 50% of the maximum coolant flow to the damaged half of the reactor. The third group is a set of electrical pumps drawing water from the deaerators. The short-term pumps can be powered by the spindown of the main turbogenerators.[18]

ECCS for long-term cooling of the damaged circuit consists of three pairs of electrical pumps, drawing water from the pressure suppression pools; the water is cooled by the plant service water by means of heat exchangers in the suction lines. Each pair is able to supply half of the maximum coolant flow. ECCS for long-term cooling of the intact circuit consists of three separate pumps drawing water from the condensate storage tanks, each able to supply half of the maximum flow. The ECCS pumps are powered from the essential internal 6 kV lines, backed up by diesel generators. Some valves that require uninterrupted power are also backed up by batteries.[18]

Reactor control/supervision systems

[edit]
The control room of a first generation RBMK at Kursk Nuclear Power Plant
The control room of Chernobyl Unit 3, a second generation RBMK, and twin of Chernobyl Unit 4. A large circular mimic display for every channel or core map is on the left

The distribution of power density in the reactor is measured by ionization chambers located inside and outside the core. The physical power density distribution control system (PPDDCS) has sensors inside the core; the reactor control and protection system (RCPS) uses sensors in the core and in the lateral biological shield tank. The external sensors in the tank are located around the reactor middle plane, therefore do not indicate axial power distribution nor information about the power in the central part of the core.

There are over 100 radial and 12 axial power distribution monitors, employing self-powered detectors. Reactivity meters and removable startup chambers are used for monitoring of reactor startup. Total reactor power is recorded as the sum of the currents of the lateral ionization chambers. The moisture and temperature of the gas circulating in the channels is monitored by the pressure tube integrity monitoring system.

The PPDDCS and RCPS are supposed to complement each other. The RCPS system consists of 211 movable control rods. Both systems, however, have deficiencies, most noticeably at low reactor power levels. The PPDDCS is designed to maintain reactor power density distribution between 10 and 120% of nominal levels and to control the total reactor power between 5 and 120% of nominal levels. The LAC-LAP (local automatic control and local automatic protection) RPCS subsystems rely on ionization chambers inside the reactor and are active at power levels above 10%.

Below those levels, the automatic systems are disabled and the in-core sensors are not accessible. Without the automatic systems and relying only on the lateral ionization chambers, control of the reactor becomes very difficult; the operators do not have sufficient data to control the reactor reliably and have to rely on their intuition. During startup of a reactor with a poison-free core this lack of information can be manageable because the reactor behaves predictably, but a non-uniformly poisoned core can cause large nonhomogenities of power distribution, with potentially catastrophic results.

The reactor emergency protection system (EPS) was designed to shut down the reactor when its operational parameters are exceeded. The design accounted for steam collapse in the core when the fuel element temperature falls below 265 °C, coolant vaporization in fuel channels in cold reactor state, and sticking of some emergency protection rods. However, the slow insertion speed of the control rods, together with their design causing localized positive reactivity as the displacer moves through the lower part of the core, created a number of possible situations where initiation of the EPS could itself cause or aggravate a reactor runaway.

The SKALA or SCALA computer system for calculation of the reactivity margin was collecting data from about 4,000 sources. Its purpose was to assist the operator with steady-state control of the reactor. Ten to fifteen minutes were required to cycle through all the measurements and calculate the results. SKALA could not control the reactor, instead it only made recommendations to the operators, and it used 1960s computer technology.[28]

The operators could disable some safety systems, reset or suppress some alarm signals, and bypass automatic scram, by attaching patch cables to accessible terminals. This practice was allowed under some circumstances.

The reactor is equipped with a fuel rod leak detector. A scintillation counter detector, sensitive to energies of short-lived fission products, is mounted on a special dolly and moved over the outlets of the fuel channels, issuing an alert if increased radioactivity is detected in the steam-water flow.

In RBMK control rooms there are two large panels or mimic displays representing a top view of the reactor. One display is made up mostly or completely (in first generation RBMKs) of colored dials or rod position indicators: these dials represent the position of the control rods inside the reactor and the color of the housing of the dials matches that of the control rods, whose colors correspond to their function, for example, red for automatic control rods. The other display is a core map or core channel cartogram and is circular, is made of tiles, and represents every channel on the reactor. Each tile is made of a single light cover with a channel number[29] and an incandescent light bulb, and each light bulb illuminates to represent out-of-spec (higher or lower than normal) channel parameters.

Operators have to type in the number of the affected channel(s) and then view the instruments to find exactly what parameters are out of spec. The core map represented information from the SKALA computer. Each unit had its own computer housed in a separate room. The control room also has chart or trend recorders. Some RBMK control rooms have been upgraded with video walls that replace the mimic displays and most chart recorders and eliminate the need to type in channel numbers and instead operators lay a cursor over a (now representative) tile to reveal its parameters that are shown on the lower side of the video wall.[30] The control room is located below the floor of the deaerator room. Both rooms are in the space between the reactor and turbine buildings.

Containment

[edit]

The RBMK design was built primarily to be powerful, quick to build and easy to maintain. Full physical containment structures for each reactor would have more than doubled the cost and construction time of each plant, and since the design had been certified by the Soviet nuclear science ministry as inherently safe when operated within established parameters, the Soviet authorities assumed proper adherence to doctrine by workers would make any accident impossible. RBMK reactors were designed to allow fuel rods to be changed at full power without shutting down, as in the pressurized heavy water CANDU reactor, both for refueling and for plutonium production for nuclear weapons. This required large cranes above the core.

As the RBMK reactor core is very tall (about 7 m (23 ft 0 in)), the cost and difficulty of building a heavy containment structure prevented the building of additional emergency containment structures for pipes on top of the reactor core. In the Chernobyl accident, the pressure rose to levels high enough to blow the top off the reactor, breaking open the fuel channels in the process and starting a massive fire when air contacted the superheated graphite core. After the Chernobyl accident, some RBMK reactors were retrofitted with a partial containment structure, in lieu of a full containment building, which surround the fuel channels with water jackets in order to capture any radioactive particles released.

The bottom part of the reactor is enclosed in a watertight compartment. There is a space between the reactor bottom and the floor. The reactor cavity overpressure protection system consists of steam relief assemblies embedded in the floor and leading to Steam Distributor Headers covered with rupture discs and opening into the Steam Distribution Corridor below the reactor, on level +6. The floor of the corridor contains entrances of a large number of vertical pipes, leading to the bottoms of the Pressure Suppression Pools ("bubbler" pools) located on levels +3 and +0. In the event of an accident, which was predicted to be at most a rupture of one or two pressure channels, the steam was to be bubbled through the water and condensed there, reducing the overpressure in the leaktight compartment. The flow capacity of the pipes to the pools limited the protection capacity to simultaneous rupture of two pressure channels; a higher number of failures would cause pressure buildup sufficient to lift the cover plate ("Structure E", after the explosion nicknamed "Elena", not to be confused with the Russian ELENA reactor), sever the rest of the fuel channels, destroy the control rod insertion system, and potentially also withdraw control rods from the core.[31]

The containment was designed to handle failures of the downcomers, pumps, and distribution and inlet of the feedwater. The leaktight compartments around the pumps can withstand overpressure of 0.45 MPa (65 psi). The distribution headers and inlets enclosures can handle 0.08 MPa (12 psi) and are vented via check valves to the leaktight compartment. The reactor cavity can handle overpressure of 0.18 MPa (26 psi) and is vented via check valves to the leaktight compartment. The pressure suppression system can handle a failure of one reactor channel, a pump pressure header, or a distribution header.[18]

Leaks in the steam piping and separators are not handled, except for maintaining slightly lower pressure in the riser pipe gallery and the steam drum compartment than in the reactor hall. These spaces are also not designed to withstand overpressure. The steam distribution corridor contains surface condensers. The fire sprinkler systems, operating during both accident and normal operation, are fed from the pressure suppression pools through heat exchangers cooled by the plant service water, and cool the air above the pools. Jet coolers are located in the topmost parts of the compartments; their role is to cool the air and remove the steam and radioactive aerosol particles.[18]

Hydrogen removal from the leaktight compartment is performed by removal of 800 m3 (28,000 cu ft)/hour of air, its filtration, and discharge into the atmosphere. The air removal is stopped automatically in case of a coolant leak and has to be reinstated manually. Hydrogen is present during normal operation due to leaks of coolant (assumed to be up to 2 t (2.2 short tons) per hour).[18]

Other systems

[edit]

For the nuclear systems described here, the Chernobyl Nuclear Power Plant is used as the example.

Electrical systems

[edit]

The power plant is connected to the 330 kV and 750 kV electrical grid. The block has two electrical generators connected to the 750 kV grid by a single generator transformer. The generators are connected to their common transformer by two switches in series. Between them, the unit transformers are connected to supply power to the power plant's own systems; each generator can therefore be connected to the unit transformer to power the plant, or to the unit transformer and the generator transformer to also feed power to the grid. The 330 kV line is normally not used, and serves as an external power supply, connected by a station transformer to the power plant's electrical systems.[18]

The plant can be powered by its own generators, or get power from the 750 kV grid through the generator transformer, or from the 330 kV grid via the station transformer, or from the other power plant block via two reserve busbars. In case of total external power loss, the essential systems can be powered by diesel generators. Each unit transformer is connected to two 6 kV main power boards, A and B (e.g. 7A, 7B, 8A, 8B for generators 7 and 8), powering principal non-essential drivers and connected to transformers for the 4 kV main power and the 4 kV reserve busbar.[18]

The 7A, 7B, and 8B boards are also connected to the three essential power lines, namely for the coolant pumps, each also having its own diesel generator. In case of a coolant circuit failure with simultaneous loss of external power, the essential power can be supplied by the spinning down turbogenerators for about 45–50 seconds, during which time the diesel generators should start up. The generators are started automatically within 15 seconds at loss of off-site power.[18]

Turbogenerators

[edit]

The electrical energy is generated by a pair of 500 MW hydrogen-cooled turbogenerators. These are located in the 600 m (1,968 ft 6 in)-long machine hall, adjacent to the reactor building. The turbines, the venerable five-cylinder K-500-65/3000, are supplied by the Kharkiv turbine plant. The electrical generators are the TVV-500. The turbine and the generator rotors are mounted on the same shaft. The combined weight of the rotors is almost 200 t (220 short tons) and their nominal rotational speed is 3000 rpm.[15]

The turbogenerator is 39 m (127 ft 11 in) long and its total weight is 1,200 t (1,300 short tons). The coolant flow for each turbine is 82,880 t (91,360 short tons)/h. The generator produces 20 kV 50 Hz AC power. The generator's stator is cooled by water while its rotor is cooled by hydrogen. The hydrogen for the generators is manufactured on-site by electrolysis.[15] The design and reliability of the turbines earned them the State Prize of Ukraine for 1979.

The Kharkiv turbine plant (now Turboatom) later developed a new version of the turbine, K-500-65/3000-2, in an attempt to reduce use of valuable metal. The Chernobyl plant was equipped with both types of turbines; Block 4 had the newer ones.

Design variants

[edit]

RBMK-1500

[edit]

The primary difference between RBMK-1000 and RBMK-1500 reactors is that the RBMK-1500 is cooled with less water, which adopts a helical laminar flow instead of a purely laminar flow through the channels. The RBMK-1500 also uses less uranium. The helical flow is created by turbulators in the fuel assembly and increases heat removal.[32][33] Because of the RBMK's positive void coefficient, the reduced cooling water volume causes a higher power output. As the name suggests, it was designed for an electrical power output of 1500 MW. The only reactors of this type and power output are the ones at Ignalina Nuclear Power Plant.[34]

RBMK-2000 and RBMK-3600

[edit]

The RBMK-2000[32] and RBMK-3600[35] were designed to produce 2000 and 3600 MW of electrical power respectively. The RBMK-2000 would have had an increased channel diameter and number of fuel rods per fuel assembly while maintaining the same dimensions of the reactor core as the RBMK-1000 and RBMK-1500. The RBMK-3600 presumably similarly to the RBMK-1500 would have added turbulators to the RBMK-2000 design to increase heat removal.

RBMKP-2400

[edit]

The RBMKP-2400 is rectangular instead of cylindrical, and it was a modular, theoretically infinitely longitudinally expandable design with vertical steam separators, intended to be made in sections at a factory for assembly in situ. It was designed to have a power output of 2400 MWe, and a higher thermal efficiency due to steam superheating directly in the reactor core in special fuel channels with fuel rods with stainless steel cladding instead of the more common Zircaloy cladding, for a steam outlet temperature of 450 °C. No reactor with this power output has ever been built, with the most powerful one currently being as of 2018 the 1750 MWe EPR.[34] The development of this design was cancelled in the aftermath of the Chernobyl disaster. An RBMKP-4800 would have had an increased number of evaporating and superheating channels thus increasing power output.[36][37] Two RBMKP-2400s were planned for the Kostroma Nuclear Power Plant.[38]

Design flaws and safety issues

[edit]

As an early Generation II reactor based on 1950s Soviet technology, the RBMK design was optimized for speed of production over redundancy. It was designed and constructed with several design characteristics that proved dangerously unstable when operated outside their design specifications. The decision to use a graphite core with natural uranium fuel allowed for massive power generation at only a quarter of the expense of heavy water reactors, which were more maintenance-intensive and required large volumes of expensive heavy water for startup. However, it has also had unexpected negative consequences that would not reveal themselves fully until the Chernobyl disaster in 1986.

High positive void coefficient

[edit]

Light water (ordinary H2O) is both a neutron moderator and a neutron absorber. This means that not only can it slow down neutrons to velocities in equilibrium with surrounding molecules ("thermalize" them and turn them into low-energy neutrons, known as thermal neutrons, that are far more likely to interact with the uranium-235 nuclei than the fast neutrons produced by fission initially), but it also absorbs some of them.

In the RBMK series of reactors, light water functions as a coolant, while moderation is mainly carried out by graphite. As graphite already moderates neutrons, light water has a lesser effect in slowing them down, but could still absorb them. This means that the reactor's reactivity (adjustable by appropriate neutron-absorbing rods) must take into account the neutrons absorbed by light water.

In the case of vaporisation of water to steam, the place occupied by water would be occupied by water vapor, which has a density vastly lower than that of liquid water (the exact number depends on pressure and temperature; at standard conditions, steam is about 11350 as dense as liquid water). Because of this lower density (of mass, and consequently of atom nuclei able to absorb neutrons), light water's neutron-absorption capability practically disappears when it boils. This allows more neutrons to fission more U-235 nuclei and thereby increase the reactor power, which leads to higher temperatures that boil even more water, creating a thermal feedback loop.

In RBMK reactors, generation of steam in the coolant water would then in practice create a void: a bubble that does not absorb neutrons. The reduction in moderation by light water is irrelevant, as graphite still moderates the neutrons. However, the loss of absorption dramatically alters the balance of neutron production, causing a runaway condition in which more and more neutrons are produced, and their density grows exponentially. Such a condition is called a "positive void coefficient", and the RBMK reactor series has the highest positive void coefficient of any commercial reactor ever designed.

A high void coefficient does not necessarily make a reactor inherently unsafe, as some of the fission neutrons are emitted with a delay of seconds or even minutes (post-fission neutron emission from daughter nuclei), and therefore steps can be taken to reduce the fission rate before it becomes too high. This situation, however, does make it considerably harder to control the reactor, especially at low power. Thus, control systems must be very reliable and control-room personnel must be rigorously trained in the peculiarities and limits of the system. Neither of these requirements were in place at Chernobyl: since the reactor's actual design bore the approval stamp of the Kurchatov Institute and was considered a state secret, discussion of the reactor's flaws was forbidden, even among the actual personnel operating the plant. Some later RBMK designs did include control rods on electromagnetic grapples, thus controlling the reaction speed and, if necessary, stopping the reaction completely. The RBMK reactor at Chernobyl, however, had manual clutch control rods.

All RBMK reactors underwent significant changes following the Chernobyl disaster. The positive void coefficient was reduced from +4.5 β to +0.7 β,[39][40] decreasing the likelihood of further reactivity accidents, at the cost of higher enrichment requirements of the uranium fuel.[41]

Improvements since the Chernobyl accident

[edit]

In his posthumously published memoirs, Valery Legasov, the First Deputy Director of the Kurchatov Institute of Atomic Energy, revealed that the institute's scientists had long known that the RBMK had significant design flaws.[42][43] Legasov's suicide in 1988, following frustrated attempts to promote nuclear and industrial safety reform, caused shockwaves throughout the scientific community. The RBMK's design problems were discussed increasingly openly.[44]

Following the accident at Chernobyl, all remaining RBMK reactors were retrofitted with a number of updates for safety. The largest of these updates fixed the RBMK control rod design. The control rods have 4.5-metre (14 ft 9 in) graphite displacers, which prevent coolant water from entering the space vacated as the rods are withdrawn. In the original design, those displacers, being shorter than the height of the core, left 1.25-metre (4.1 ft) columns of water at the bottom (and 1.25 metres [4.1 ft] at the top) when the rods were fully extracted.[4]

During insertion, the graphite would first displace that lower water, locally increasing reactivity. Also, when the rods were in their uppermost position, the absorber ends were outside the core, requiring a relatively large displacement before achieving a significant reduction in reactivity.[45] These design flaws were likely the final trigger of the first explosion of the Chernobyl accident, causing the lower part of the core to become prompt critical when the operators tried to shut down the highly destabilized reactor by reinserting the rods. The updates are:

  • An increase in fuel enrichment from 2% to 2.4% to compensate for control rod modifications and the introduction of additional absorbers.
  • Manual control rod count increased from 30 to 45.
  • 80 additional absorbers inhibit operation at low power, where the RBMK design is most dangerous.
  • AZ-5 (emergency reactor shutdown or SCRAM) sequence reduced from 18 to 12 seconds.
  • Addition of the БАЗ or BAZ* system,[46] (rapid reactor emergency protection) which would insert 24 uniformly distributed rods into the reactor core via a modified drive mechanism within 1.8 to 2.5 seconds.
  • Precautions against unauthorized access to emergency safety systems.

In addition, RELAP5-3D models of RBMK-1500 reactors were developed for use in integrated thermal-hydraulics-neutronics calculations for the analysis of specific transients in which the neutronic response of the core is important.[47]

*BAZ button is intended as a preemptive measure to bring down reactivity before AZ-5 is activated, to enable the safe and stable emergency shutdown of a RBMK.

Deformed graphite moderator blocks

[edit]

From May 2012 to December 2013, Leningrad-1 was offline while repairs were made related to deformed graphite moderator blocks. The 18-month project included research and the development of maintenance machines and monitoring systems. Similar work will be applied to the remaining operational RBMKs.[48] Graphite moderator blocks in the RBMK can be repaired and replaced in situ, unlike in the other current large graphite moderated reactor, the advanced gas-cooled reactor.[49]

Longitudinal cutting in some of the graphite columns during lifetime extension refurbishment work can return the graphite stack to its initial design geometry.[50]

Further development

[edit]

A post-Soviet redesign of the RBMK is the MKER (Russian: МКЭР, Многопетлевой Канальный Энергетический Реактор [Mnogopetlevoy Kanalniy Energeticheskiy Reaktor], which means Multi-loop pressure tube power reactor), with improved safety and a containment building.[51][52] A MKER-800, MKER-1000 and MKER-1500 were planned for the Leningrad nuclear power plant.[53][54][55]

Closures

[edit]

Of the 17 RBMKs built, all three surviving reactors at the Chernobyl plant have now been closed. Unit 1 was closed in 1996, Unit 3 in 2000, Unit 4 having been destroyed in the accident, and Unit 2 disabled after a hydrogen explosion in 1991. Chernobyl 5 and 6 were under construction at the time of the accident at Chernobyl, but further construction was stopped due to the high level of contamination at the site limiting its longer-term future. Both reactors at Ignalina in Lithuania were also shut down.[56]

Russia is the only country to still operate reactors of this design: Leningrad (2 RBMK-1000), Smolensk (3 RBMK-1000) and Kursk (2 RBMK-1000), Kursk Unit 1 was shut down via its BSM key on December 19, 2021, the last time the plant would run all four of its units side by side.[57] There are currently no further RBMK Reactors under construction in Russia. The last RBMK Reactor in Russia is expected to shut down in 2034 at Smolensk-3.

List of RBMK reactors

[edit]

Color key:

 Operational reactor (including reactors currently offline)       – Reactor decommissioned   – Reactor destroyed in accident  Abandoned or cancelled reactor construction
Location[58] Current
Country
Reactor type Online Status Net
Capacity
(MWe)
Gross
Capacity
(MWe)
Chernobyl-1 Ukraine RBMK-1000 1977 shut down in 1996 740 800
Chernobyl-2 Ukraine RBMK-1000 1978 shut down in 1991 925 1,000
Chernobyl-3 Ukraine RBMK-1000 1981 shut down in 2000 925 1,000
Chernobyl-4 Ukraine RBMK-1000 1983 destroyed in 1986 925 1,000
Chernobyl-5 Ukraine RBMK-1000 1984 construction cancelled in 1988 950 1,000
Chernobyl-6 Ukraine RBMK-1000 1985 construction cancelled in 1988 950 1,000
Ignalina-1 Lithuania RBMK-1500 1983 shut down in 2004 1,185 1,300[A]
Ignalina-2 Lithuania RBMK-1500 1987 shut down in 2009 1,185 1,300[A]
Ignalina-3 Lithuania RBMK-1500 N/A construction cancelled in 1988 1,380 1,500
Ignalina-4 Lithuania RBMK-1500 N/A plan cancelled in 1988 1,380 1,500
Kostroma-1 Russia RBMKP-2400 N/A construction cancelled in 1980s 2,260 2400
Kostroma-2 Russia RBMKP-2400 N/A construction cancelled in 1980s 2,260 2400
Kursk-1 Russia RBMK-1000 1977 shut down in 2021 925 1,000
Kursk-2 Russia RBMK-1000 1979 shut down in 2024 925 1,000
Kursk-3 Russia RBMK-1000 1984 operational until 2033[14] 925 1,000
Kursk-4 Russia RBMK-1000 1985 operational until 2035[14] 925 1,000
Kursk-5[51] Russia RBMK-1000[B] N/A construction cancelled in 2012 925 1,000
Kursk-6 Russia RBMK-1000 N/A construction cancelled in 1993 925 1,000
Leningrad-1 Russia RBMK-1000 1974 shut down in 2018[9] 925 1,000
Leningrad-2 Russia RBMK-1000 1976 shut down in 2020[59] 925 1,000
Leningrad-3 Russia RBMK-1000 1979 operational until June 2025[60] 925 1,000
Leningrad-4 Russia RBMK-1000 1981 operational until August 2026[60] 925 1,000
Smolensk-1 Russia RBMK-1000 1983 operational until 2028[60] 925 1,000
Smolensk-2 Russia RBMK-1000 1985 operational until 2030[60] 925 1,000
Smolensk-3 Russia RBMK-1000 1990 operational until 2034[60] 925 1,000
Smolensk-4 Russia RBMK-1000 N/A construction cancelled in 1993 925 1,000
A Built with 1,500 MWe gross electric power, the RBMK-1500 were de-rated to 1,360 MW after the Chernobyl disaster.

A graphite-moderated Magnox reactor exists in North Korea at the Yongbyon Nuclear Scientific Research Center.[61] While the gas cooled Magnox, AGR and pebble bed reactors (Such as the Dragon reactor at Winfrith) use graphite as moderators their use of gases (carbon dioxide for Magnox and AGR, while helium for Dragon) as heat transfer fluids causes them to have no void coefficient.

Known incidents

[edit]

Many incidents occurred at various power plants operating the RBMK reactor. Most of them were covered up by the USSR government.[citation needed] These are some of the known incidents at the RBMK reactors:

1. Explosion of a tank holding radioactive gases at the Leningrad unit 1 in January 1975.

2. Partial meltdown at Leningrad unit 1 in 1975.

3. Power outage at the Kursk Nuclear Power Plant in 1980.

4. Partial meltdown at Chernobyl unit 1 in 1982.

5. Discovery of the positive scram effect at Ignalina unit 1 in 1983.

6. Shifting of the concrete cross bars at Chernobyl units 3 and 4 in 1984.

7. Chernobyl disaster in 1986.

8. Turbine fire at Chernobyl unit 2 in 1991 resulting in its permanent shutdown.

See also

[edit]

References

[edit]
  1. ^ a b "Archived copy" (PDF). www-pub.iaea.org. Archived (PDF) from the original on 2018-05-25. Retrieved 2018-06-01.{{cite web}}: CS1 maint: archived copy as title (link)
  2. ^ "Russia shuts down Soviet-built nuclear reactor". The Washington Times. Archived from the original on 2020-04-06. Retrieved 2019-05-28.
  3. ^ a b c d "RBMK Reactors | reactor bolshoy moshchnosty kanalny | Positive void coefficient – World Nuclear Association". www.world-nuclear.org. Retrieved 2024-04-24.
  4. ^ a b "RBMK Reactors | reactor bolshoy moshchnosty kanalny | Positive void coefficient – World Nuclear Association". www.world-nuclear.org. Archived from the original on 2018-11-05. Retrieved 2019-06-18.
  5. ^ "Forsmark: how Sweden alerted the world about the danger of the Chernobyl disaster". Topics | European Parliament. 2014-05-15. Retrieved 2024-04-24.
  6. ^ Ascarelli, Brett (2019-05-31). "25 years after Chernobyl, how Sweden found out". Sveriges Radio. Retrieved 2024-04-24.
  7. ^ Chernov D., Sornette D. Man-Made Catastrophes and Risk Information Concealment: Case Studies of Major Disasters and Human Fallibility. Springer. 2015. P. 71
  8. ^ Luis, Lederman (January 1996). "Safety of RBMK reactors: Setting the technical framework" (PDF). International Atomic Energy Agency.
  9. ^ a b "Russia shuts down Soviet-built nuclear reactor – The Washington Times". The Washington Times. Archived from the original on 2019-05-28. Retrieved 2019-05-28.
  10. ^ "The "Dark" Accident At The Metsamor Nuclear Plant – 1982 | Art-A-Tsolum". allinnet.info. April 2020. Archived from the original on 2021-09-01. Retrieved 2021-02-14.
  11. ^ History of the atomic energy of the Soviet Union and Russia. Issue 3. History of RBMK. Ed. Sidorenko V.A. - Moscow, IzdAT, 2003. . "History of Rosatom" ('История атомной энергетики Советского Союза и России. Вып. 3. История РБМК. Под ред. Сидоренко В. А. — М.: ИздАТ, 2003.. Электронная библиотека «История Росатома» — http://elib.biblioatom.ru/text/istoriya-atomnoy-energetiki_v3_2003/go,0/ Archived 2021-01-21 at the Wayback Machine)
  12. ^ a b c d e f g Higginbotham, Adam (February 4, 2020). Midnight in Chernobyl: The Untold Story of the World's Greatest Nuclear Disaster. Simon and Schuster. ISBN 978-1-5011-3463-0. Archived from the original on September 1, 2021. Retrieved May 4, 2021 – via Google Books.
  13. ^ "Life extension for Russia's second generation RBMK reactors". Nuclear Engineering International. 12 July 2024. Retrieved 16 July 2024.
  14. ^ a b c "Станки становятся в строй" [The machines are being put into operation]. Kommersant. 15 December 2022. Retrieved 6 November 2024.
  15. ^ a b c d e "Energoatom Concern OJSC" Smolensk NPP " About the Plant " Generation" (in Russian). Snpp.rosenergoatom.ru. 2008-04-30. Retrieved 2010-03-22.[permanent dead link]
  16. ^ a b c d e "Accident Analysis for Nuclear Power Plants with Graphite Moderated Boiling Water RBMK Reactors" (PDF). Archived (PDF) from the original on 2020-04-06. Retrieved 2010-03-22.
  17. ^ Mikhail V. Malko. "The Chernobyl Reactor: Design Features and Reasons for Accident" (PDF). Institute for Integrated Radiation and Nuclear Science, Kyoto University. S2CID 1490526.
  18. ^ a b c d e f g h i j k l Chernobyl: a technical appraisal ... – Google Books. Thomas Telford. 1987. ISBN 978-0-7277-0394-1. Archived from the original on 2021-09-01. Retrieved 2010-03-22.
  19. ^ a b c d "Fuel Channel". Insc.anl.gov. Archived from the original on April 6, 2018. Retrieved 2010-03-22.
  20. ^ a b c "Information Bridge: DOE Scientific and Technical Information – Sponsored by OSTI" (PDF). Osti.gov. Archived from the original on 2021-09-01. Retrieved 2010-03-22.
  21. ^ a b Malko, Mikhail (July 2002), "The Chernobyl Reactor: Design Features and Reasons for Accident" (PDF), in Imanaka, Tetsuji (ed.), Recent Research Activities about the Chernobyl NPP Accident in Belarus, Ukraine and Russia, Research Reactor Institute, Kyoto University, pp. 11–27, archived (PDF) from the original on 2019-11-08, retrieved 2020-01-10
  22. ^ ":: RBMK-1000 AND RBMK-1500 NUCLEAR FUEL". Elemash.ru. Archived from the original on 2006-10-07. Retrieved 2010-03-22.
  23. ^ "Fuel Assembly". Insc.anl.gov. Archived from the original on April 6, 2018. Retrieved 2010-03-22.
  24. ^ https://www-pub.iaea.org/MTCD/publications/PDF/Pub913e_web.pdf Archived 2019-12-14 at the Wayback Machine page 119
  25. ^ "WHO – World Health Organization" (PDF). whqlibdoc.who.int. Archived from the original (PDF) on 2013-12-27. Retrieved 2010-04-17.
  26. ^ "Brief Description of the Plant". Lei.lt. Archived from the original on 2019-06-26. Retrieved 2010-03-22.
  27. ^ "Schema principu AES". Pavrda.cz. Archived from the original on 2020-02-17. Retrieved 2010-03-22.
  28. ^ "INSAG-7 The Chernobyl Incident" (PDF). Archived (PDF) from the original on 2019-12-14. Retrieved 2019-12-13.
  29. ^ "Light Cover from Chernobyl Control Room". www.orau.org. Retrieved 2021-10-12.
  30. ^ Upgrade of the Kursk NPP main control room (case study) October 2010, International Control Room Design Conference:ICOCO 2010, Paris, France. DOI 10.13140/2.1.1412.9929
  31. ^ "Archived copy" (PDF). www-pub.iaea.org. Archived (PDF) from the original on 2018-10-20. Retrieved 2010-04-17.{{cite web}}: CS1 maint: archived copy as title (link)
  32. ^ a b Dollezhal N. A., Emelyanov I. Ya. Channel nuclear power reactor. - M .: Atomizdat, 1980. (Доллежаль Н. А., Емельянов И. Я. Канальный ядерный энергетический реактор. — М.: Атомиздат, 1980.)
  33. ^ Nigmatulin IN, Nigmatulin BI, Nuclear power plants. Textbook for universities. M .: Energoatomizdat, 1986.(Нигматулин И. Н., Нигматулин Б. И., Ядерные энергетические установки. Учебник для ВУЗов. М.: Энергоатомиздат, 1986.)
  34. ^ a b "Archived copy" (PDF). www.iaea.org. Archived (PDF) from the original on 2018-04-27. Retrieved 2018-11-18.{{cite web}}: CS1 maint: archived copy as title (link)
  35. ^ Nuclear Power Plants: Collection of Articles. Issue 8, Energoatomizdat, 1985. (Атомные электрические станции: Сборник статей. Вып. 8, Энергоатомиздат, 1985.)
  36. ^ "5.5.Проект реактора рбмкп-2400". Archived from the original on 2019-01-13. Retrieved 2021-02-21.
  37. ^ N. A. Dollezhal, I. Ya. Emelyanov. Channel nuclear power reactor // Chapter 11. Prospects for the development of channel uranium-graphite reactors. (http://elib.biblioatom.ru/text/dollezhal_kanalnyy-yadernyy-reaktor_1980/go,189 Archived 2021-08-27 at the Wayback Machine), - Moscow, Atomizdat, 1980. (Н. А. Доллежаль, И. Я Емельянов. Канальный ядерный энергетический реактор // Глава 11. Перспективы развития канальных уран-графитовых реакторов. — Москва: Атомиздат, 1980.)
  38. ^ Dollezhal N.A. At the origins of the man-made world: Notes of the designer - M .: Knowledge, 1989 - Academician's Tribune - 256s.(Доллежаль Н. А. У истоков рукотворного мира: Записки конструктора — М.: Знание, 1989 — Трибуна академика — 256с.)
  39. ^ Kingery, Thomas (2011). "Boiling Water-Cooled Graphite-Moderated Reactors (RBMK)". Nuclear Energy Encyclopedia: Science, Technology, and Applications. John Wiley & Sons. ch 20.6. ISBN 978-1-118-04348-6.
  40. ^ Steed, Roger (2006). Nuclear Power: In Canada and Beyond. General Store Publishing House. p. 274. ISBN 978-1-897113-51-6.
  41. ^ "INSAG-7 The Chernobyl Incident" (PDF). pp. 124–125. Archived (PDF) from the original on 2019-12-14. Retrieved 2022-01-03.
  42. ^ "The Ukrainian Weekly, page 2, Sunday January 26, 2003" (PDF). Archived (PDF) from the original on February 18, 2012. Retrieved September 28, 2009.
  43. ^ History of the International Atomic Energy Agency: The First Forty Years Archived 2019-08-04 at the Wayback Machine, page 194, David Fischer
  44. ^ The Bulletin of the Atomic Scientists, September 1993, page 40.
  45. ^ "The Chernobyl Incident" (PDF). Archived (PDF) from the original on 2019-12-14. Retrieved 2019-12-13.
  46. ^ RBMK SHUTDOWN SYSTEMS. Vienna, Austria: IAEA. June 1995. p. 9.
  47. ^ "Development of Ignalina NPP RBMK-1500 reactor RELAP5-3D model" (PDF). www.inl.gov. Archived from the original (PDF) on 2012-09-24. Retrieved 2012-06-25.
  48. ^ "Restored RBMK back on line". World Nuclear News. 2 December 2013. Archived from the original on 16 December 2019. Retrieved 3 December 2013.
  49. ^ "Concerns Persist Over Safety of Cracking Inside Reactor in Scotland: Nuclear Safery Expert". RIA Novosti. 7 October 2014. Archived from the original on 16 October 2014. Retrieved 10 October 2014.
  50. ^ "Russia completes upgrade of third Smolensk RBMK". World Nuclear News. 28 March 2019. Archived from the original on 6 April 2020. Retrieved 17 July 2019.
  51. ^ a b "Russia's Nuclear Fuel Cycle – Russian Nuclear Fuel Cycle – World Nuclear Association". world-nuclear.org. Archived from the original on 2013-02-13. Retrieved 2008-09-27.
  52. ^ "NIKET – Department of Pressure-Tube Power Reactors". Archived from the original on October 10, 2006.
  53. ^ "mkr1000raz". www.lnpp.ru. Archived from the original on 2011-10-05. Retrieved 2008-09-27.
  54. ^ "03_Cherkashov_NIKIET.doc". 11 October 2006. Archived from the original (DOC) on 11 October 2006.
  55. ^ "Bellona – Statistics from Leningrad Nuclear Power Plant". Archived from the original on July 4, 2009.
  56. ^ "Early Soviet reactors & EU accession". Archived from the original on 2005-10-24. Retrieved 2005-10-31.
  57. ^ "PRIS Home Page". Archived from the original on 2011-01-07. Retrieved 2007-08-16.
  58. ^ *Chernobyl 1 Archived 2011-06-04 at the Wayback Machine
  59. ^ "На Ленинградской АЭС после 45 лет успешной работы окончательно остановлен энергоблок № 2". rosatom.ru. Archived from the original on 2020-11-10. Retrieved 2020-11-10.
  60. ^ a b c d e "Nuclear Power in Russia". World Nuclear Association. 15 April 2016. Archived from the original on 4 August 2019. Retrieved 26 April 2016.
  61. ^ Belfer Center (2013-09-10), Nuclear 101: How Nuclear Bombs Work" Part 2/2, archived from the original on 2019-05-20, retrieved 2019-06-01 [a slide at 00:33:00]
[edit]