Puducherry–New Delhi Express
Overview | |
---|---|
Service type | Superfast Express |
Status | Weekly |
First service | 3 July 2011 |
Current operator(s) | Northern Railway zone |
Route | |
Termini | Puducherry New Delhi |
Stops | 13 |
Distance travelled | 2,380 km (1,479 mi) |
Average journey time | 38 hours 20 mins |
Service frequency | Weekly |
Train number(s) | 22403 / 22404 |
On-board services | |
Class(es) | AC 1st, AC 2 tier, AC 3 tier, Sleeper class, General Unreserved |
Seating arrangements | Yes |
Sleeping arrangements | Yes |
Catering facilities | Yes |
Technical | |
Rolling stock | LHB coach |
Track gauge | 1,676 mm (5 ft 6 in) |
Operating speed | 56.5 km/h (35 mph), including halts |
The 22403 / 22404 Puducherry - New Delhi S. F Express is a Superfast Express train belonging to Indian Railways – Northern Railway zone that runs between Puducherry and New Delhi in India via Chennai Egmore.[1]
It operates as train number 22403 from Puducherry to New Delhi and as train number 22404 in the reverse direction, serving the states of Puducherry, Tamil Nadu, Andhra Pradesh, Telangana, Maharashtra, Madhya Pradesh, Rajasthan, Uttar Pradesh, Haryana & Delhi.
Service
[edit]The 22403 Puducherry–New Delhi Express covers the distance of 2,380 km (1,479 mi) in 38 hours 20 mins (57 km/h) and in 38 hours 00 mins as 22404 New Delhi–Puducherry Express (56 km/h).
Routing
[edit]The 22403 / 04 Puducherry–New Delhi Express runs from Puducherry via Viluppuram Junction,Chennai Egmore, Gudur Junction, Vijayawada Junction, Warangal, Balharshah, Nagpur Junction, Itarsi Junction, Bhopal Junction, Jhansi Junction, Gwalior Junction, Agra Cantonment, Mathura Junction to New Delhi.
Timing
[edit]- 22403 – Starts from Puducherry every Wednesday at 9:50 AM and reaches New Delhi on Friday 00:10 AM IST.
- 22404 – Starts for New Delhi on every Sunday at 23:15 hrs IST and reaches Puducherry on Tuesday at 13:15 hrs IST.
Traction
[edit]As this route is electrified and the train belongs to Northern Railway zone, a Ghaziabad-based WAP-7 powers the train up end to end from New Delhi to Puducherry and vice versa.
Coach composition
[edit]The coach composition of the 22403 / 22404 train is:
- 1 AC First Class
- 2 AC Two Tier
- 6 AC Three Tier
- 6 Sleeper coaches
- 2 General Unreserved
- 2 End-on Generator car (EOG)
Loco | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
EOG | GEN | H1 | A1 | A2 | B1 | B2 | B3 | B4 | B5 | B6 | S1 | S2 | S3 | S4 | S5 | S6 | GEN | EOG |
References
[edit]- ^ Ayyappan, V (25 June 2015). "Railways cancels nine trains". The Times of India. Retrieved 3 January 2019.
External links
[edit]- 22403 Puducherry New Delhi Superfast Express at India Rail Info
- 22404 New Delhi Puducherry Superfast Express at India Rail Info
- Transport in Delhi
- Transport in Puducherry
- Express trains in India
- Rail transport in Puducherry
- Rail transport in Tamil Nadu
- Rail transport in Andhra Pradesh
- Rail transport in Telangana
- Rail transport in Maharashtra
- Rail transport in Madhya Pradesh
- Rail transport in Uttar Pradesh
- Rail transport in Delhi
- Railway services introduced in 2011