Jump to content

Bucharest Metro Line M3

From Wikipedia, the free encyclopedia
(Redirected from M3 Line)
Line M3
Politehnica station
Overview
StatusOperational
Termini
Stations15
Service
TypeRapid transit
SystemBucharest Metro
Operator(s)Metrorex S.A.
Depot(s)Preciziei
Rolling stockBM1 (Astra IVA)
BM2 (Bombardier), BM3 CAF (Metro Mania Only)
Ridership26949000 (2019)[1]
History
Opened19 August 1983 (1983-08-19)
as a M1 branch
Technical
Line length22.20 km (13.79 mi)
Track gauge1,432 mm (4 ft 8+38 in)
Electrification750 V DC third rail
Route map

Preciziei depot
Handicapped/disabled access Preciziei
Handicapped/disabled access Păcii
Handicapped/disabled access Gorjului
Handicapped/disabled access Lujerului
Handicapped/disabled access Politehnica
M1 to Dristor (loop)
Handicapped/disabled access Eroilor M5
Handicapped/disabled access Izvor
Handicapped/disabled access Piața Unirii M2
Handicapped/disabled access Timpuri Noi
Mihai Bravu
Handicapped/disabled access Dristor M1
Handicapped/disabled access Nicolae Grigorescu
Handicapped/disabled access 1 Decembrie 1918
Handicapped/disabled access Nicolae Teclu
Handicapped/disabled access Anghel Saligny

M3 (22.2 km (13.8 mi)) is one of the five lines of the Bucharest Metro. M3 Line runs from Anghel Saligny to Preciziei. It is the east-west line of the system. The line shares 8.67 km (5.39 mi) and 7 stations with M1.[2]

History

[edit]

The first part of the present-day M3 to be built was from Eroilor to Preciziei (at the time known as Industriilor) along with the line to Industriilor depot (nearby the ITB Militari depot), west of the station itself. This section was not a line on its own, but rather a branch of the M1, and it opened on 19 August 1983. During the communist period the 'M3' was the Gara de Nord - Dristor 2 section of what is today the M1.[3] Construction work on another branch, from Nicolae Grigorescu to Anghel Saligny (at time named Leontin Sălăjan and Linia de Centură), began in 1988, but the work was halted in 1996 and the tunnels were flooded.[4]

Due to the very large gap between Pacii and Lujerului (then known as Armata Poporului) construction of Gorjului started. It was opened in two stages: the westbound platform in 1994 and the eastbound platform in 1998.

In the mid 2000s the route of the M3 was shortened from Pantelimon - Industriilor to Eroilor - Industriilor and the M3 became a shuttle service, similar to the M4.

In 2008, the long-overdue section from Nicolae Grigorescu to Linia de Centură, for which construction works resumed in 2004, was finally opened, also as a shuttle, as an extension of the M4.[4] Because a line composed of two unconnected shuttles was very impractical, on 4 July 2009 the two branches from Preciziei and Anghel Saligny were linked sharing tracks with the M1 between Eroilor and Nicolae Grigorescu and thus forming the M3 as it is operated today.

Rolling stock

[edit]
An old IVA train at Lujerului.

The M3 uses Astra IVA and Bombardier Movia trains. The IVA trains were used exclusively until 2009, when the first Movia trains were introduced on the M3, and services from Preciziei to Anghel Saligny commenced. In 2014, after the arrival of new CAF trains and the migration of Movia trains from the M2 to the M3 was complete, the old trains were no longer needed. IVA trains were reintroduced in 2020, when 8 Movia train sets were transferred to the new Line 5.[5]

Name changes

[edit]
Station Previous name(s) Years
Preciziei Industriilor 1983–2009
Lujerului Armata Poporului 1983–2009
Nicolae Teclu Policolor 2008–2009
Anghel Saligny Linia de Centură 2008–2009

Extensions

[edit]

An extension from Păcii towards the A1 Motorway and the Western Industrial Park is planned for 2030.[6]

Map

[edit]

Map


References

[edit]
  1. ^ "Activity Report 2019" (PDF). Metrorex S.A. p. 38. Retrieved 2020-12-20.
  2. ^ "Activity Report 2018" (PDF). Metrorex S.A. p. 6. Retrieved 2020-12-20.
  3. ^ Ovenden, Mark (2007). Transit Maps of the World (2nd ed.). Penguin Books. p. 83. ISBN 978-0-14-311265-5.
  4. ^ a b Ciugudean, V.; Stefanescu, I.; Arghiroiu, O. (May 2002). Ozdemir, Levent (ed.). Monitoring measures for underground rehabilitation of Line 4 Bucharest, Romania. North American Tunneling Conference. Seattle: CRC Press. pp. 57–67. ISBN 9-05-809376-X. Retrieved 2020-12-23.
  5. ^ "Trenurile Bombardier încep probele pe M5 Drumul Taberei – Eroilor iar trenurile IVA au revenit pe M3" [Bombardier trains start tests on M5 Drumul Taberei - Eroilor and IVA trains have returned on M3]. mobilitate.eu (in Romanian). 23 May 2020. Retrieved 2020-09-21.
  6. ^ Vlad Ignat. "Păianjenul Metrorex schimbă harta Capitalei. Bucureştenii se mută în subteran, din 2030" [Metrorex's Web Project changes the map of Bucharest. Bucharest moves underground by 2030]. Adevărul (in Romanian). Retrieved 2014-05-07.