Line 2 (Coimbatore Metro)
Appearance
Green Line | |
---|---|
Overview | |
Status | Proposed |
Termini |
|
Stations | 14 |
Service | |
Type | Rapid transit |
System | Coimbatore Metro |
Technical | |
Number of tracks | 2 |
Character | 14.4 km Elevated |
Operating speed | 80 km/h (50 mph) |
The GreenLine or Line 2 is one of the two proposed lines of Coimbatore Metro, Phase 1 Project, the second being the Red line (Line 1). The line stretches from Coimbatore Junction to Valiyampalayam Pirivu. The line consists of 14 stations.[1][2]
Stations
[edit]The stations proposed in the first phase of Coimbatore Metro in the Line-2 are:[3]
Green Line | ||||||||
---|---|---|---|---|---|---|---|---|
S.No | Station Name | Interchange connection | Places Connected | Layout | Opened | Depot Connection | Depot Layout | |
English | Tamil | |||||||
1 | Coimbatore Junction | கோயம்புத்தூர் சந்திப்பு | Red Line, Coimbatore Junction railway station | Coimbatore Government Hospital | Elevated | Proposed Phase 1 | None | None |
2 | Ramnagar | ராம்நகர் | None | None | Elevated | Proposed Phase 1 | None | None |
3 | Gandhipuram Central Bus Terminus | காந்திபுரம் மத்திய பேருந்து நிலையம் | Gandhipuram Central Bus Terminus, Gandhipuram Town Bus stand | None | Elevated | Proposed Phase 1 | None | None |
4 | Coimbatore Omni Bus Stand | கோயம்புத்தூர் ஆம்னி பேருந்து நிலையம் | Coimbatore Omni Bus Terminus | None | Elevated | Proposed Phase 1 | None | None |
5 | Moor Market | மூர் மார்க்கெட் | None | None | Elevated | Proposed Phase 1 | None | None |
6 | Ganapathy Pudur | கணபதி புதூர் | None | None | Elevated | Proposed Phase 1 | None | None |
7 | Athipalayam | அத்திபாளையம் | None | None | Elevated | Proposed Phase 1 | None | None |
8 | Ramakrishna Mills | ராமகிருஷ்ணா மில்ஸ் | None | Prozone Mall | Elevated | Proposed Phase 1 | None | None |
9 | Vinayagapuram | விநாயகபுரம் | None | None | Elevated | Proposed Phase 1 | None | None |
10 | Chithra Nagar | சித்ரா நகர் | None | None | Elevated | Proposed Phase 1 | None | None |
11 | Saravanampatti | சரவணம்பட்டி | None | None | Elevated | Proposed Phase 1 | None | None |
12 | Viswasapuram | விஸ்வாசபுரம் | None | None | Elevated | Proposed Phase 1 | None | None |
13 | VGP Nagar | விஜிபி நகர் | None | None | Elevated | Proposed Phase 1 | None | None |
14 | Valiyampalayam Pirivu | வலியம்பாளையம் பிரிவு | None | None | Elevated | Proposed Phase 1 | None | None |
See also
[edit]- Line 1 (Coimbatore Metro)
- Coimbatore Metro
- Transport in Coimbatore
- List of rapid transit systems in India
- List of metro systems
References
[edit]- ^ "DPR for Coimbatore metro rail project to be submitted to Tamil Nadu government by July 15". The Hindu. 1 July 2023. Retrieved 1 July 2023.
- ^ "CMRL Submits Detailed Project Reports for Madurai and Coimbatore Metro Projects". The Metro Rail News. 15 July 2023. Retrieved 15 July 2023.
- ^ "39km Metro Line project in Phase 1". India Herald. 7 July 2023. Retrieved 7 July 2023.