Jump to content

Georgetown–Lewes Trail

From Wikipedia, the free encyclopedia
(Redirected from Lewes–Georgetown Trail)

The Lewes-Georgetown Trail is an 11 mile long rail trail built on the right-of-way of the abandoned portion of the Junction and Breakwater Railroad between Georgetown, Delaware and Lewes, Delaware. It currently exists in three segments: a 0.7 mile rail-with-trail section between Parsons Lane and Airport Road in Georgetown, a 7.5 mile rail-to-trail section from Fischer Road on the east side of Cool Spring, Delaware, to the Lewes and Rehoboth Canal in Lewes, and a 1.6 mile rail-to-trail section from the canal to Cape Henlopen State Park in Lewes.[1]

Background

[edit]

The railroad was built in the 19th Century and ran along this route until 2016 when the bridge over the Lewes and Rehoboth Canal was deemed unsafe and too expensive to replace. Operations were shut down, the last train ran in 2017. The line was decommissioned the next year and shortly after the railroad right-of-way was converted to a trail. When the trail is complete it will be 17 miles long.[2]

Planning for the trail began in 2006, with the Statewide Rails to Trails / Rails with Trails Master Plan. At the time the railroad was still running and it was envisioned as a shared use path adjacent to the freight line, but when the railroad was abandoned planners moved it to the abandoned ROW which was cheaper as it required less environmental impact work.[3][4] The project was envisioned as having 11 phases. The first phase from Gills Neck Road to Savannah Road in Lewes was opened in October 2016, but after that the railroad was shut down for much of the route, the trail design was updated and in 2018 the rail was removed.[5] Phases II & III, from Savannah Road to Minos Conaway Road and then to Log Cabin Road in Lewes, was completed as one project in June of 2019, and with some extra money was extended (Phase IV) to Route 9/Cool Spring Road in 2020.[5][6] Phase V from Georgetown Little League Park on Parsons Lane and Airport Road east of Georgetown was opened on November 19, 2021.[5] Phase VI, from Cool Spring Road to Fisher Road was completed in September 2022.[7] Phase VII, from the Lewes and Rehoboth Canal to Cape Henlopen State Park was completed by summer of 2023. The last four phases are projected for completion by 2026.[8] When completed the trail will run all the way from Georgetown, DE where the rail junction is to Cape Henlopen State Park.[2]

In 2022, by which time the trail in Lewes was built, the Delaware Department of Transportation removed the bridge over the canal and built a trailhead and fishing area at the end of the trail along the canal side.[9]

Trail Description

[edit]
The preserved canal swing bridge along the trail
1917 Red Caboose at Lewes next to the trail

The trail starts in Georgetown, where connects residents to the Georgetown Little League Complex, the Sussex Academy of Arts and Science, and the future Sussex County Park.

After a 7-mile gap it picks up Fischer Road and passes through a tree tunnel, meadows and fields and the town of Lewes, where a park next to the Lewes Public Library offers parking, restrooms, benches, a water bottle–filling station, and an in-formation kiosk. The park also features preserved rails, a replica train station and a restored caboose from the old Delaware Coast Line Railroad that used to run the rail line. That section ends at the canal where it connects to the Junction and Breakwater Trail.

From the eastern section trailhaed, the trail goes east towards the coast. After a brief stretch of street traffic, the trail's wide lanes open up to a beautiful mix of sand, sea grass, and pine trees, offering intermittent shade. Just before Cape Henlopen State Park the trail leaves the railroad ROW and moves onto a protected bike lane.

References

[edit]
  1. ^ "Georgetown-Lewes Trail". Traillink. Retrieved 26 November 2024.
  2. ^ a b MacArthur, Ron (26 May 2024). "Trail work could resume in late 2024". Cape Gazette. Retrieved 26 November 2024.
  3. ^ MacArthur, Ron (22 August 2017). "State updates design for Lewes-Georgetown Trail". Cape Gazette. Retrieved 29 November 2024.
  4. ^ "Lewes-to-Georgetown Trailhead Evaluation" (PDF). Retrieved 28 November 2024.
  5. ^ a b c MacArthur, Ron (23 November 2021). "Officials open another Lewes-Georgetown Trail section". Retrieved 29 November 2024.
  6. ^ "Phase II of Rail-to-Trail Project Opens up Safer Active Transportation Options". Retrieved 29 November 2024.
  7. ^ "DelDOT Bike Program Project Updates" (PDF). Retrieved 28 November 2024.
  8. ^ "Project: Georgetown to Lewes Trail, Fisher Road to Airport Road". Retrieved 28 November 2024.
  9. ^ MacArthur, Ron (4 February 2022). "Lewes swing bridge project gets back on track". Cape Gazette. Retrieved 26 November 2024.