Jump to content

Huanghua–Dajiawa railway

From Wikipedia, the free encyclopedia
(Redirected from Huanghua-Dajiawa railway)
Huanghua–Dajiawa railway
Huangda Railway 2018
Overview
Native name黄大铁路
StatusOperational
Termini
Service
TypeFreight rail
History
Opened26 December 2020
Technical
Line length216.8 km (135 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25,000 V

The Dezhou–Dajiawa railway is a single-track electrified railway line in China. It opened on 26 December 2020 and is used for the transportation of coal.[1]

History

[edit]

Construction on the line began on 13 September 2014. At the time, it was expected to open in September 2017.[2]

References

[edit]
  1. ^ "环渤海能源新通道黄大铁路全线开通运营" [The new channel of The Yellow River Railway, a new channel around Bohai Energy, was opened and operated]. 界面 (in Chinese). 26 December 2020. Retrieved 16 February 2021.
  2. ^ "神华集团黄大铁路项目开工建设" [Construction of the Huangda Railway Project of Shenhua Group began]. 16 September 2014. Archived from the original on 23 May 2015. Retrieved 16 February 2021.