DescriptionStaircase Range Cutting, near Springsure, Queensland.jpg
English: Sign reads: This section of the road was built around 1905. Chinese labour was used to carve the cutting out of the sandstone using only hand tools. An improved crossing of the range was built by Bauhinia Shire in the late 1920's to the north of this site. The current highway was complete in 1979 Bauhinia Shire Council for a cost of $1.73 million.
to share – to copy, distribute and transmit the work
to remix – to adapt the work
Under the following conditions:
attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.