English: Mauricie, MRC Mékinac, Saint-Adelphe (Parish Municipality), Route 352, Bridge P01548 with reinforced concrete girders (1950), Batiscan River at the mouth of the Pierre-Paul River, spires of the bell towers of the Catholic church, village, cultivated field, Curé-Adélard-Lamy cemetery, Sunday, October 29, 2023.
Français : Mauricie, MRC Mékinac, Saint-Adelphe (Municipalité de paroisse), route 352, pont P01548 à poutres en béton armé (1950), rivière Batiscan à l’embouchure de la rivière Pierre-Paul, flèches des clochers de l’église catholique, village, champ cultivé, cimetière Curé-Adélard-Lamy, le dimanche 29 octobre 2023.
to share – to copy, distribute and transmit the work
to remix – to adapt the work
Under the following conditions:
attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
https://creativecommons.org/licenses/by/4.0CC BY 4.0 Creative Commons Attribution 4.0 truetrue
Captions
Highway 352, P01548 reinforced concrete girder bridge (1950), Batiscan River
Route 352, pont P01548 à poutres en béton armé (1950), rivière Batiscan