Jump to content

File:MMS455d barchart shear ram failures.png

Page contents not supported in other languages.
This is a file from the Wikimedia Commons
From Wikipedia, the free encyclopedia

MMS455d_barchart_shear_ram_failures.png (496 × 280 pixels, file size: 95 KB, MIME type: image/png)

Description Results of testing shear rams. Piechart from p.3 in MINI SHEAR STUDY for U.S. Minerals Management Service, Requisition No. 2-1011-1003, December 2002.
Date
Source http://www.mms.gov/tarprojects/455/Final%20Report.pdf
Author West Engineering Services, Inc.
Permission
(Reusing this file)
Public domain This article or image contains material based on a work of a Minerals Management Service employee, created as part of that person's official duties. As a work of the U.S. federal government, such work is in the public domain in the United States. See MMS Disclaimer.

MMS Project 455 was a preliminary study designed to answer the question “Can a given rig’s BOP equipment shear the pipe to be used in a given drilling program at the most demanding condition to be expected?” Half the units tested failed. These results were confirmed with a much larger study (Project 463) in 2004.

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts

December 2002

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current15:09, 17 June 2010Thumbnail for version as of 15:09, 17 June 2010496 × 280 (95 KB)Macquigg~commonswiki{{Information |Description= |Source= |Date= |Author= |Permission= |other_versions= }}

Global file usage