File:Checking the alignment of a turbine shaft at the top of the guide bearing in TVA's hydroelectric plant, Watts Bar Dam, Tenn.jpg
Appearance
Size of this preview: 795 × 600 pixels. Other resolutions: 318 × 240 pixels | 636 × 480 pixels | 1,018 × 768 pixels | 1,280 × 966 pixels | 2,560 × 1,932 pixels | 8,030 × 6,060 pixels.
Original file (8,030 × 6,060 pixels, file size: 3.69 MB, MIME type: image/jpeg)
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 00:21, 18 October 2009 | 8,030 × 6,060 (3.69 MB) | Jan Arkesteijn | == {{int:filedesc}} == {{Information |Description={{en|1=Checking the alignment of a turbine shaft at the top of the guide bearing in TVA's hydroelectric plant, Watts Bar Dam, Tenn. Located 530 miles above the mouth of the Tennessee River, the dam has an |
File usage
The following pages on the English Wikipedia use this file (pages on other projects are not listed):
Global file usage
The following other wikis use this file:
- Usage on de.wikipedia.org
- Usage on ja.wikipedia.org