DescriptionBeacon Park Yard with second mainline track construction, October 2016.JPG
English: Second track under construction through Beacon Park Yard in October 2016. The second main track was previously turned into a yard track in the 1950s, limiting commuter rail frequency and reliability.
to share – to copy, distribute and transmit the work
to remix – to adapt the work
Under the following conditions:
attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation License, Version 1.2 or any later version published by the Free Software Foundation; with no Invariant Sections, no Front-Cover Texts, and no Back-Cover Texts. A copy of the license is included in the section entitled GNU Free Documentation License.http://www.gnu.org/copyleft/fdl.htmlGFDLGNU Free Documentation Licensetruetrue
You may select the license of your choice.
Captions
Add a one-line explanation of what this file represents
== {{int:filedesc}} == {{Information |Description ={{en|1=Second track under construction through Beacon Park Yard in October 2016. The second main track was previously turned into a yard track in the 1950s, limiting commuter rail frequency and reli...