Cirata Dam
Cirata Dam | |
---|---|
Country | Indonesia |
Location | Cadassari, Purwakarta |
Coordinates | 6°42′02″S 107°22′01″E / 6.70056°S 107.36694°E |
Status | Operational |
Construction began | 1984 |
Opening date | 1988 |
Dam and spillways | |
Type of dam | Embankment, concrete-face rock-fill |
Impounds | Citarum River |
Height | 125 m (410 ft) |
Length | 453 m (1,486 ft) |
Dam volume | 3,900,000 m3 (5,101,007 cu yd) |
Reservoir | |
Total capacity | 2,165,000,000 m3 (1,755,194 acre⋅ft) |
Active capacity | 796,000,000 m3 (645,328 acre⋅ft) |
Catchment area | 4,119 km2 (1,590 sq mi) |
Surface area | 62 km2 (24 sq mi) |
Cirata Power Station | |
Coordinates | 6°40′52.19″S 107°20′48.48″E / 6.6811639°S 107.3468000°E |
Operator(s) | PT. PLN Nusantara Power |
Commission date | 1988–1998, Floating solar: 2023 |
Type | Run-of-the-river |
Turbines | 8 x 126 MW Francis-type |
Installed capacity | 1,008 MW of Hydroelectricity + 192 MW of Floating solar |
The Cirata Dam is an embankment dam on the Citarum River in West Java, Indonesia. It is located 100 km (62 mi) southeast of Jakarta. It was constructed between 1984 and 1988 for the primary purpose of hydroelectric & photovoltaic power generation. Other purposes include flood control, aquaculture, water supply and irrigation. The 125 m (410 ft) tall concrete-face rock-fill dam is situated just before a sharp bend in the river and withholds a reservoir with a gross storage capacity of 2,165,000,000 m3 (1,755,194 acre⋅ft). The reservoir has a surface area of 62 km2 (24 sq mi) which caused the relocation of 6,335 families. The construction of the dam resulted in involuntary resettlement of 56,000 people.[1]
Hydroelectricity
[edit]The hydroelectric power station is located on the north side of the river bend and contains eight 126 MW Francis turbine-generators. It has a total installed capacity of 1,008 MW and an annual generation of 1,426 GWh. The power station was completed in two phases, the second was completed in 1998. It serves mostly as a peaking power plant and is the largest hydroelectric power station in Indonesia.[2][3]
Floating solar panels
[edit]On 9 November 2023, the floating solar panels that were built above the dam became operational. It has the capacity of 192 MW, making it the largest floating solar power plant in Southeast Asia.[4]
The solar power plant alone is giving a contribution to the Net zero emissions of 245 Gigawatt-hours (GWh) of clean & renewable energy and reducing carbon emissions by 210,000 tons of CO2 annually.[5]
See also
[edit]- List of power stations in Indonesia
- List of conventional hydroelectric power stations
- List of floating solar panels power plant
References
[edit]- ^ B. Terminski, Development-Induced Displacement and Resettlement: Theoretical Frameworks and Current Challenges, Geneva 2013.
- ^ "IEA Hydropower Implementing Agreement Annex VIII – Cirata Dam" (PDF). Case Study 14-05: Development of Regional Industries – Cirata Hydro Electric Power Project, Indonesia. IEA Hydropower. Archived from the original (PDF) on 19 March 2012. Retrieved 19 January 2012.
- ^ "Hydroelectric Power Plants in Indonesia". IndustCards. Retrieved 19 January 2012.
- ^ Media, Kompas Cyber (2023-11-09). "PLTS Terapung Cirata Diresmikan, Potensi Waduk Lain Menanti Digarap". KOMPAS.com (in Indonesian). Retrieved 2023-11-12.
- ^ Muliawati, Firda Dwi. "PLTS Terapung Cirata Cuma Makan Lahan Waduk 4%". CNBC Indonesia (in Indonesian). Retrieved 2023-11-12.