Changying station
Appearance
(Redirected from Changying Station)
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Changtong Road (常通路) and North Chaoyang Road (朝阳北路) Changying, Chaoyang District, Beijing China | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 6 | ||||||||||
Platforms | 4 (2 island platforms) | ||||||||||
Tracks | 4 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 30, 2012 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Changying (simplified Chinese: 常营站; traditional Chinese: 常營站; pinyin: Chángyíng Zhàn) is a station on Line 6 of the Beijing Subway.[1] This station opened on December 30, 2012.[2]
Station layout
[edit]The station has underground dual-island platforms.
Exits
[edit]There are 4 exits, lettered B, C, E, and F. Exits B, E and F are accessible.
Gallery
[edit]-
Exit B up close
-
Exit B
-
Exit B structure
-
Exit B is embedded in a commercial building.
-
Elevator serving exit B
-
Exit F
-
Concourse
-
Eastbound Platform
-
Platform with escalator to the left
-
Eastbound Platform
-
Westbound platform
-
Station art
References
[edit]- ^ "轨道交通6号线预计年底试运营 五项第一彰显北京地铁新奇迹 - 要闻速递 - 北京市交通委员会". Archived from the original on 2012-11-11. Retrieved 2012-09-26.
- ^ 北京四地铁线30日开通 首末车时间确定. QQ News. Retrieved December 26, 2012.
External links
[edit]- Media related to Changying Station at Wikimedia Commons
39°55′33″N 116°35′59″E / 39.925696°N 116.599722°E