Atal Setu, Sikkim
Atal Setu Bridge | |
---|---|
Coordinates | 27°10′34″N 88°31′43″E / 27.1761°N 88.5287°E |
Locale | Rangpo, Pakyong district, Sikkim, India |
Characteristics | |
Total length | 1123 m (3684 ft) |
Location | |
Atal Setu Bridge is located at Rangpo, Pakyong district, Sikkim. It is the longest roadway bridge of Sikkim. It was inaugurated by Honourable President of India Smt. Droupadi Murmu on 4 November 2022. It is constructed by National Highways and Infrastructure Development Corporation Limited (NHIDCL). The 1,123 m long bridge over River Rangpo lies on National Highway 10 and connects Pakyong District of Sikkim with Kalimpong district of West Bengal. The construction was started on 20 November 2017; the completion was slated on 20 February 2020 but due to certain circumstances and Covid pandemic, construction work took a little more time.[citation needed]
This bridge is also known as Rangpo IBM bridge.[1] [2][3][4] This bridge constructed on Viaduct Engineering concept has 18 modules (slabs) glued to one another from either side making it tensile enough to face 8 to 9 Richter Scale Earthquake because Sikkim lies in seismic zone 5. The bridge has two lanes - one in either direction - and has footpath on both sides. The cost of the project was Rs.56 Crore approximately.[5]
References
[edit]- ^ "President Draupadi Murmu slated to visit Sikkim on 4 Nov". www.voiceofsikkim.com.
- ^ "सिक्किम : रंगपो में जल्द खोला जाएगा अटल सेतु". jantaserishta.com. 3 November 2022.
- ^ "सिक्किम के सबसे लंबे पुल 'अटल सेतु' का सुरम्य ड्रोन फुटेज". jantaseristha.com. 3 November 2022.
- ^ "sikkim all geared up to welcome president Droupadi Murmu". www.uniindia.com.
- ^ "Picturesque Drone Footage Of Sikkim's Longest Bridge 'Atal Setu'". www.voiceofsikkim.com.